Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of concrete. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The UNC System Office (Design/Construction) has issued a solicitation for the design and construction of an Education Boardwalk and attached research pier at the Coastal Studies Institute to improve accessibility and educational/research facilities. The project includes design of an ADA-accessible raised boardwalk (~1,500 linear feet), outdoor classrooms, observation platforms, and an attached research pier with shoreline access. The period of performance is expected to begin on award and complete by January 14, 2026; estimated project value is between $500,000 and $2,000,000.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The UNC System Office (Design/Construction) has issued a solicitation for the design and construction of an Education Boardwalk and attached research pier at the Coastal Studies Institute to improve accessibility and educational/research facilities. The project includes design of an ADA-accessible raised boardwalk (~1,500 linear feet), outdoor classrooms, observation platforms, and an attached research pier with shoreline access. The period of performance is expected to begin on award and complete by January 14, 2026; estimated project value is between $500,000 and $2,000,000.
AvailableThis project consists of replacing the curb and gutter. Additionally replacing the curb and gutter, a concrete valley gutter, ADA ramps, and installing a new ADA ramp.
Posted Date
Dec 16, 2025
Due Date
Jan 12, 2026
Release: Dec 16, 2025
Close: Jan 12, 2026
This project consists of replacing the curb and gutter. Additionally replacing the curb and gutter, a concrete valley gutter, ADA ramps, and installing a new ADA ramp.
AvailableIn general, the improvements on which bids are requested will require the 893 LF 30" wide 8" thick Concrete Curb & Gutter, 3180 SF 8" thick Concrete Fillets, 4270 SF Concrete Removal, and other miscellaneous items to complete the project.
Posted Date
Dec 24, 2025
Due Date
Jan 12, 2026
Release: Dec 24, 2025
Close: Jan 12, 2026
In general, the improvements on which bids are requested will require the 893 LF 30" wide 8" thick Concrete Curb & Gutter, 3180 SF 8" thick Concrete Fillets, 4270 SF Concrete Removal, and other miscellaneous items to complete the project.
AvailableClose: Jan 13, 2026
Post-tension concrete pickle ball courts project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →