Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Florida Atlantic University
Project consist of Flooring and Base. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Riverside Unified School District
Furnish and install, remove and replace specified flooring as needed throughout the district.
Posted Date
Nov 5, 2025
Due Date
Dec 9, 2025
Release: Nov 5, 2025
Riverside Unified School District
Close: Dec 9, 2025
Furnish and install, remove and replace specified flooring as needed throughout the district.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Village of Elkhart Lake
Project consists of a new municipal building. The new Welcome Center is a 2,198 SF facility that will include a new visitor/tourist lobby area, a conference room, staff offices, staff toilet and break area, mechanical room and toilets for adjacent park use, accessed from the exterior and adjacent plaza to be used for public events. This is only a solicitation for flooring. The work includes providing approx. 200 SF of epoxy resin flooring and approx. 440 SF of epoxy terrazzo flooring work at the new Welcome Center. The work includes epoxy resin flooring at 2 exterior accessed toilet rooms and one exterior accessed storage room. The epoxy terrazzo flooring work will be located within the new lobby space and includes a terrazzo representation. BP 9.4A - Resinous Flooring.
Posted Date
Nov 21, 2025
Due Date
Dec 4, 2025
Release: Nov 21, 2025
Village of Elkhart Lake
Close: Dec 4, 2025
Project consists of a new municipal building. The new Welcome Center is a 2,198 SF facility that will include a new visitor/tourist lobby area, a conference room, staff offices, staff toilet and break area, mechanical room and toilets for adjacent park use, accessed from the exterior and adjacent plaza to be used for public events. This is only a solicitation for flooring. The work includes providing approx. 200 SF of epoxy resin flooring and approx. 440 SF of epoxy terrazzo flooring work at the new Welcome Center. The work includes epoxy resin flooring at 2 exterior accessed toilet rooms and one exterior accessed storage room. The epoxy terrazzo flooring work will be located within the new lobby space and includes a terrazzo representation. BP 9.4A - Resinous Flooring.
Kalamazoo Public Schools
Perform high school flooring.
Posted Date
Nov 30, 2025
Due Date
Dec 16, 2025
Release: Nov 30, 2025
Kalamazoo Public Schools
Close: Dec 16, 2025
Perform high school flooring.
AvailableHendry County
Work includes flooring replacement.
Posted Date
Oct 22, 2025
Due Date
Dec 4, 2025
Release: Oct 22, 2025
Hendry County
Close: Dec 4, 2025
Work includes flooring replacement.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →