Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of Flooring and Base. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work involve complete demolition of the former child studies institute building.
Posted Date
Jan 11, 2026
Due Date
Feb 10, 2026
Release: Jan 11, 2026
Close: Feb 10, 2026
Work involve complete demolition of the former child studies institute building.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition and removal of existing rubber flooring, floor substrate preparation, and installation of new rubber flooring. Full floor preparation and troweled mastic adhesive to receive the new rubber tile floors and stair treads. The temporary relocation of furniture, within the work areas as needed. Provide and install matching color transition strips between rooms of dissimilar material. Provide and install new color compatible coved vinyl base in areas which have that existing condition. Proper off-site removal of all project-related rubbish.
Posted Date
-
Due Date
Feb 11, 2026
Release: -
Close: Feb 11, 2026
Demolition and removal of existing rubber flooring, floor substrate preparation, and installation of new rubber flooring. Full floor preparation and troweled mastic adhesive to receive the new rubber tile floors and stair treads. The temporary relocation of furniture, within the work areas as needed. Provide and install matching color transition strips between rooms of dissimilar material. Provide and install new color compatible coved vinyl base in areas which have that existing condition. Proper off-site removal of all project-related rubbish.
AvailableThe RFP is for installing new flooring in 84 occupied apartments.
Posted Date
-
Due Date
Feb 16, 2026
Release: -
Close: Feb 16, 2026
The RFP is for installing new flooring in 84 occupied apartments.
AvailableFlooring project; supply and installation. .
Posted Date
Jan 30, 2026
Due Date
Mar 4, 2026
Release: Jan 30, 2026
Close: Mar 4, 2026
Flooring project; supply and installation. .
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →