Vallejo Flood and Wastewater District
Special DistrictCA
Aug 11, 2026
Closes
Sep 24, 2026
Various Plant Plumbing Improvements Project
Work consists of replacement of district provided chemical feed pumps. Includes rebuilding distribution piping header. Replacement of lime slurry loop piping with new pipe and Victaulic couplings. Installation of duplex pump station serving district's administration building. Includes new electrical conduit and conductors. Installation of modular restroom building, including power, water, and sewer connections.