Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
New tornado storm shelter.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes a new capitol heights middle school for 650 students, the abatement and demolition of the existing school, new parking and athletic fields.
Posted Date
Nov 10, 2025
Due Date
Feb 18, 2026
Release: Nov 10, 2025
Close: Feb 18, 2026
Work includes a new capitol heights middle school for 650 students, the abatement and demolition of the existing school, new parking and athletic fields.
AvailablePremium
Access the largest public sector contact database
The City of Lockhart is rebidding improvements to its animal shelter focused on remodeling the existing kennel building, including resealing floors and walls. Alternates include a 1,200 SF expansion of the existing PEMB kennel building and a covered sally port.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
The City of Lockhart is rebidding improvements to its animal shelter focused on remodeling the existing kennel building, including resealing floors and walls. Alternates include a 1,200 SF expansion of the existing PEMB kennel building and a covered sally port.
AvailableBrief project description: minor demolition; carpentry work; batt insulation; flashings, trim and sealants; replace existing entrance doors, door frames and hardware; gypsum board patching and taping; painting; HVAC systems - replace existing boiler with ducted furnace system, duct work distribution; new fans; electrical work - electrical connections and controls for HVAC system; new wiring from existing panel through wire mold, painted.
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
Brief project description: minor demolition; carpentry work; batt insulation; flashings, trim and sealants; replace existing entrance doors, door frames and hardware; gypsum board patching and taping; painting; HVAC systems - replace existing boiler with ducted furnace system, duct work distribution; new fans; electrical work - electrical connections and controls for HVAC system; new wiring from existing panel through wire mold, painted.
AvailableKenyon Middle School, Glenbrook & Century Oaks Elementary School furniture, fixtures & equipment.
Posted Date
Nov 2, 2025
Due Date
Dec 19, 2025
Release: Nov 2, 2025
Close: Dec 19, 2025
Kenyon Middle School, Glenbrook & Century Oaks Elementary School furniture, fixtures & equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis