CityVT
Posted
Sep 25, 2026
Oct 7, 2026
Old Brook Road Slope Stabilization RFP
The scope of the Old Brook Road stabilization project will include a Mechanically Stabilized Earth (MSE) wall supporting the roadway's southbound (western) lane, and the MSE wall will be supported by a soil nail stabilized slope extending down to the slope toe. The construction sequence is anticipated to establish a bench on the slope, while maintaining one lane of traffic on Old Brook Road throughout the project.
