Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Kirkland
Construction of water mains, fire hydrants, and water service connections; replacement of concrete sidewalk and curb; tree removal; paving HMA trench patching; gravity block wall; restoration; traffic control; and other work includes 1 LS abandon water system, 1,900 ton crushed surfacing top course, 400 ton HMA CL 1/2" PG 58H-22 permanent patch, 1,330 LF ductile iron pipe for water main 8" diam., class 52 incl. fittings.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Fairview Park
Project consists of water main improvement.
Posted Date
Jun 27, 2025
Due Date
Dec 12, 2025
Release: Jun 27, 2025
City of Fairview Park
Close: Dec 12, 2025
Project consists of water main improvement.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Borough of Denver
Water main replacement. Including 1 LS Abandon existing 6-inch water main, cut pipe, cap pipe; 481 LF 6" Ductile Iron Concrete Lined (DICL) Water Main; 98 ton AASHTO #8 Stone; 165 ton 2A Subbase; 13 ton 2" Cold Patch to match existing elevation; 12 SY sidewalk restoration - match existing reveal; 22 LF curb restoration - match existing reveal; 2 ea connect new 6" water main to existing 6" pipe; 2 ea connect new 6" water main to existing 10" pipe 1 ea fire hydrant with 6" DIP, 6" gate valve and 3"X6" tee. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 15, 2025
Release: Nov 19, 2025
Borough of Denver
Close: Dec 15, 2025
Water main replacement. Including 1 LS Abandon existing 6-inch water main, cut pipe, cap pipe; 481 LF 6" Ductile Iron Concrete Lined (DICL) Water Main; 98 ton AASHTO #8 Stone; 165 ton 2A Subbase; 13 ton 2" Cold Patch to match existing elevation; 12 SY sidewalk restoration - match existing reveal; 22 LF curb restoration - match existing reveal; 2 ea connect new 6" water main to existing 6" pipe; 2 ea connect new 6" water main to existing 10" pipe 1 ea fire hydrant with 6" DIP, 6" gate valve and 3"X6" tee. See attached file.
AvailableCity of Joliet
Work includes installation of approx. 4,610 LF of 4" to 16" water main.
Posted Date
Nov 6, 2025
Due Date
Dec 9, 2025
Release: Nov 6, 2025
City of Joliet
Close: Dec 9, 2025
Work includes installation of approx. 4,610 LF of 4" to 16" water main.
AvailableCity of Joliet
Work includes installation of approximately 4,600 linear feet of 6- inch to 20-inch water main and approximately 1,000 linear feet of 8-inch to 15-inch storm sewer.
Posted Date
Oct 30, 2025
Due Date
Dec 4, 2025
Release: Oct 30, 2025
City of Joliet
Close: Dec 4, 2025
Work includes installation of approximately 4,600 linear feet of 6- inch to 20-inch water main and approximately 1,000 linear feet of 8-inch to 15-inch storm sewer.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →