CityTX
Posted
Oct 25, 2026
Nov 19, 2026
Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation RFP
Seeking qualified vendors for wastewater treatment plant phase 2 - collection system rehabilitation.
Description: Natural Treatment System Maintenance, Phase 2 project. The project consists of the removal of existing treatment bed media and piping from four treatment cells, disposal of bed material on airport property, construction of new bed media, piping and outlet controls, and installation of a stormwater treatment.
FireDepartment · MI, US
Adjacent opportunities open for bidding right now.
CityTX
Posted
Oct 25, 2026
Nov 19, 2026
Seeking qualified vendors for wastewater treatment plant phase 2 - collection system rehabilitation.
CityOH
Posted
Nov 2, 2026
Nov 18, 2026
The City of Niles is soliciting sealed bids for the Wastewater Treatment Plant PHASE 2 Blower Replacement Project. Plans and specifications are available from Jason Carcelli by email or telephone. Bidders must mail sealed proposals to the City Auditor by 10:00 a.m. on November 18, 2026.
CountyNY
Posted
Sep 22, 2026
Nov 19, 2026
The project includes construction of two new biological oxygen unox reactors, unox reactor aerated influent channel, four new clarifiers with integrated flow distribution structure, new return activated sludge (ras) pump station, and tunnel extension, and improvements to the existing influent pump stations, four existing unox reactors, and electrical facilities, including process/mechanical systems, demolition, abatement of asbestos and lead-based paint, concrete, masonry, metals, thermal and moisture protection, doors and windows, painting, plumbing, heating, ventilation, and air conditioning, electrical, security, civil, utility, instrumentation and controls, and appurtenant work.
CityOK
Posted
Oct 21, 2026
Nov 19, 2026
Rehabilitation of existing water treatment plant & tank rehabilitation. Water Treatment Plant - two concrete-lined backwash holding basins with supernatant decanters, decant return lift station, valve vault and piping, paving, fencing and grading; removal of the water-treatment residuals from the existing backwash holding basins; rehabilitation of the two existing steel package filter tanks (new underdrains, media and troughs, recoating of the interior steel); replacement in kind of the existing gas-chlorinator units, chlorine dioxide booster pumps, sand recirculation pumps and backwash inlet-structure slide gates; and the electrical, instrumentation and SCADA. Existing 200,000-gallon elevated water storage tank - blast and recoat of the interior and exterior, an overflow extension with flap valve and splash pad, and disinfection.
Decision makers connected to this RFP from Gerald R. Ford International Airport Authority Fire Department.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
147 days before RFP
The Operations and Marketing Committee approved up to $2,000,000 in contracting authority for airport Natural Treatment System maintenance, with stage-one treatment cell infrastructure replacement recommended before the 2026–27 deicing season.
5-3 Resolution 26-17: Natural Treatment System (NTS) Maintenance Ms. Baker presented that the Natural Treatment System is starting to show signs of inefficiency in treating spent deicing fluid and requires maintenance. Replacement of stage- one treatment cell infrastructure is recommended prior to the 2026-27 deicing season. Motion by Mrs. Merchant,…
Gerald R. Ford International Airport Authority Operations And Marketing Committee Minutes
Board meeting · May 20, 2026
RFP published
Proposals due (5 days left)