Madison-Oneida Board of Cooperative Educational Services
School DistrictNY
Posted
Jul 2, 2026
Jan 12, 2027
Swimming Pool Supplies RFP
Swimming pool supplies.
Description: Provide a public swimming pool and amenity center construction project involving demolition of existing facilities, site preparation with extensive undercut and select clay fill placement, utility installation (water and sewer), concrete work (sidewalks, pavement), storm drainage, erosion control, fencing, and landscaping.
City · LA, US
From the first pre-RFP signals to the published RFP and its files.
Budget
485 days before RFP
The City of Natchitoches five-year capital program lists City Park Swimming Pool at $1,300,000 in two program-year columns.
CITY OF NATCHITOCHES FY 2022-2027 FIVE YEAR CAPITAL OUTLAY AND IMPROVEMENTS PROGRAM 207 Service Area/Project Description FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total Public Safety Paramedic Program $18,000 Replace Hand Held Radios $24,000 $24,000 $24,000 $24,000 $24,000 $120,000 Fire Truck Replacement Plan $141,000 $141,000 $141,000 $141,000 $564,000…
City of Natchitoches FY2025-26 Budget
Budget · Jul 1, 2025
Board meeting
53 days before RFP
Shauna Le proposed phase-one site development, civil-engineering, and foundation work for the city pool and park redesign; the Historic District Commission deferred the request pending plans and funding, which was not secured.
this is at 401 Amulet at the city park. Good afternoon. My name is Shauna Le. I'm here on behalf of both community development also parks and wreck and just wanted to um get approval for the first phase of the city park redesign from 2022 and that is to include site development city civil engineering work and also foundation work. The funding has not been…
Board meeting
24 days before RFP
The Historic District Commission approved, subject to ratification at the next meeting, demolition of the existing pool building and swimming pool to allow a new city pool and multi-purpose building.
I move to approve that. Do I hear a second? >> Second. >> It's been moved by Dano, seconded by Owens for the demolition of the existing pool building and the swimming pool itself to allow for new construction of a new city pool and multi-purpose building. All those in favor say I. >> I. >> I opposed. There being none. So, uh, you may go ahead. It will be…
Natchitoches Historic District Commission Meeting
Board meeting · Oct 5, 2026
Board meeting
3 days before RFP
The City Council considered a proposed resolution authorizing the mayor to advertise and accept bids for the Phase 1 public swimming-pool project, with bids due December 1, 2026.
a resolution to advertise for bids and to accept bids and it's read by Councilwoman at Large Smith-Kirkendall. >> Thank you, Mayor. Resolution number 071 of 2026. Resolution authorizing the mayor to advertise and accept bids for the Natchez public swimming pool project [snorts] phase one. Bid number 0684. Whereas the city wishes to advertise for public bids…
RFP published
Proposals due (9 days left)
Natchitoches Historic District Commission Meeting
Board meeting · Sep 6, 2026
Natchitoches City Council City Council Meeting
Board meeting · Oct 26, 2026
Adjacent opportunities open for bidding right now.
Madison-Oneida Board of Cooperative Educational Services
School DistrictNY
Posted
Jul 2, 2026
Jan 12, 2027
Swimming pool supplies.
CountyMD
Posted
Nov 18, 2026
Dec 16, 2026
The Board of County Commissioners of Washington County is seeking bids for swimming pool and water/wastewater treatment chemicals. Electronic submissions are accepted through the County's online bidding site. Bid documents are available through that site.
CityIN
Posted
Oct 20, 2026
Nov 23, 2026
Project includes improvements to the Town's existing wastewater treatment plant (WWTP) and collection system. The WWTP work includes but is not limited to headworks improvements: new in-channel articulating rake screen and manual bypass bar screen, ancillary structure modifications to reinforced concrete structure, grating, handrail and platform; aerated cell lagoon improvements: sludge removal, hauling and disposal, new floating aerators, new controls; replacement of clarifier tank plug valves, replacement of chlorine contact tank drain valve, new influent and effluent samplers and all other work required for the completion of WWTP improvements. The collection system work includes but is not limited to upgrading Lift Station #1, new submersible pumps, new monitoring and control package with VFDs and all lift station accessories for a complete operational pump system. The existing valve vault work includes replacement of check valves. Additional work includes bypass pumping, electrical utility coordination, perimeter fence installation and all other work required for the completion of the lift station improvements.
CountyMD
Posted
Oct 1, 2026
Dec 16, 2026
Swimming pool & water/wastewater treatment chemicals.
Decision makers connected to this RFP from City of Natchitoches.