Virginia Department of Transportation
State AgencyVA
Posted
Sep 9, 2026
Oct 28, 2026
A71_2026 Median, Guardrail, and Pier Protection Improvements RFP
Work include 58 LF 15" conc. Pipe; 559 CY excavation; 1,205 LF rumble strip cylindrical asphalt; 179 SY liquid asphalt coating (rumble strip); 1,760 LF saw-cut asphalt concrete full depth; 199 SY paved ditch pg-2a; 1,329 LF median barrier mb-7d; 9,205 LF remove existing guardrail; 15,993 LF guardrail htc barrier system tl-3; 191 SY demo. Of pavement flexible; 6,376 LF traffic barrier service mb-11a; 12,493 LF eradicate linear pvmt mrkg; 14,843 LF type b class vi pvmt line mrkg 6".