Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work for each part of the tank is as follows: SSPC-SP10 Near White Metal Blast for the entire Interior wet. The Interior Dry of the tank should be cleaned using SSPC-SP10 "near white metal cleanliness". For the Exterior full SSPC-SP6 “Commercial Blast”, with Class Full Rigid 2A Containment. After the repairs and recoating have been completed, the existing guide rail system will be reinstalled on top of the Elevated Steel Hydropillar Tank Water Storage Tank.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Fresno issued an Informal Public Works Bid (IPWB) to demolish and remove existing on-site buildings, foundations, concrete and asphalt pavement, landscaping, and associated improvements at 1611 N Blackstone Avenue. The project also requires cutting and capping of existing sewer and water utilities and must be completed within twenty (20) working days from the Notice to Proceed. A mandatory pre-bid conference is scheduled for 2025-12-18 and bids are due on 2026-01-13.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
The City of Fresno issued an Informal Public Works Bid (IPWB) to demolish and remove existing on-site buildings, foundations, concrete and asphalt pavement, landscaping, and associated improvements at 1611 N Blackstone Avenue. The project also requires cutting and capping of existing sewer and water utilities and must be completed within twenty (20) working days from the Notice to Proceed. A mandatory pre-bid conference is scheduled for 2025-12-18 and bids are due on 2026-01-13.
Premium
Access the largest public sector contact database
Release: Nov 18, 2025
Close: Dec 18, 2025
Water main improvements.
AvailableRelease: Nov 18, 2025
Close: Dec 18, 2025
Water main improvements.
AvailableWork includes: Surface preparation and recoating of exterior and interior of 150,000-gallon elevated spheroid water storage tank; Remove and replace existing vent; Furnish and install fall prevention on interior dry sections of tower and through existing access tube; Remove and replace riser pipe and isolation valve; Furnish and install new electrical mixer; Furnish and install pipe insulation
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes: Surface preparation and recoating of exterior and interior of 150,000-gallon elevated spheroid water storage tank; Remove and replace existing vent; Furnish and install fall prevention on interior dry sections of tower and through existing access tube; Remove and replace riser pipe and isolation valve; Furnish and install new electrical mixer; Furnish and install pipe insulation
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis