Posted
Oct 19, 2026
Nov 2, 2026
N-26 Sewer Spot Repairs, Protruding Tap and Mineral Deposit Removal RFP
The work consists of furnishing all labor, equipment, material, electrical power, and traffic control to do the required spot repair lining using cured-in-place pipe and reinstating laterals, sealing, protruding tap removals, mineral deposit removals, root removals, and other miscellaneous removals as required.
