Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of approx. 2,700 LF 8" sanitary, 1,260 LF 8" water, 1,960 LF 18" water, 200 LF 4.5' x10' precast box culvert, 8,000 LF concrete curb and gutter, 18,500 SY of base course and asphalt surfacing, and other miscellaneous items. Mobilization; force account; remove and replace topsoil; 1,170 sy remove existing surfacing; unclassified excavation; 2,700 LF 8" pvc sanitary sewer; 12 EA sanitary sewer manhole; 9 EA 4" pvc sanitary sewer service; 1 EA 6" pvc sanitary sewer service; 1 EA connect to existing sewer; 1,360 LF 8" pvc water pipe; 11 EA fire hydrant assembly; 13 EA 2" pe water service; 13 EA 4" pvc water service; 120 LF 27" steel casing; 1 EA connect to existing water; 192 LF remove existing 38" x 60" culvert; 172 CY culvert subexcavation. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 497 LF temporary fence; 4931 CY earth excavation; 2438 CY topsoil excavation and placement; 11907 SY erosion control blanket; 1218 SY heavy duty erosion control blanket; 5106 LF perimeter erosion barrier; 44 SY stone riprap, class a3; 14122 SY aggregate subgrade improvement 12"; 682 sy portland cement concrete base course widening 8"; 65 SY hot-mix asphalt surface removal - butt joint; 350 SY pavement patching, type ii, 8"; 5320 SY structure excavation; 545 LF bridge fence railing, curved; 285 LF storm sewers, class a, type 2 15"; 5 EA fire hydrants to be moved; 2 EA manholes to be adjusted; 559 LF temporary pavement marking - line 6" - epoxy.
Posted Date
Nov 4, 2025
Due Date
Jan 8, 2026
Release: Nov 4, 2025
Close: Jan 8, 2026
Work includes 497 LF temporary fence; 4931 CY earth excavation; 2438 CY topsoil excavation and placement; 11907 SY erosion control blanket; 1218 SY heavy duty erosion control blanket; 5106 LF perimeter erosion barrier; 44 SY stone riprap, class a3; 14122 SY aggregate subgrade improvement 12"; 682 sy portland cement concrete base course widening 8"; 65 SY hot-mix asphalt surface removal - butt joint; 350 SY pavement patching, type ii, 8"; 5320 SY structure excavation; 545 LF bridge fence railing, curved; 285 LF storm sewers, class a, type 2 15"; 5 EA fire hydrants to be moved; 2 EA manholes to be adjusted; 559 LF temporary pavement marking - line 6" - epoxy.
AvailableThis RFP is for Salt Storage Facility improvements, encompassing structural, architectural, and mechanical, electrical, and plumbing (MEP) repairs and alterations.
Posted Date
Nov 17, 2025
Due Date
Jan 8, 2026
Release: Nov 17, 2025
Close: Jan 8, 2026
This RFP is for Salt Storage Facility improvements, encompassing structural, architectural, and mechanical, electrical, and plumbing (MEP) repairs and alterations.
AvailableRoad improvements project.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
Close: Dec 17, 2025
Road improvements project.
AvailableRoad & bridge materials and tires.
Posted Date
Dec 5, 2025
Due Date
Dec 15, 2025
Release: Dec 5, 2025
Close: Dec 15, 2025
Road & bridge materials and tires.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis