Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of new construction of murphy usa.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking to pre-qualify contractors for subcontractor trade packages. The Varina Public Services Center project consists of new buildings along with an addition and partial renovation of their existing Administration building. This project includes a 15 acre site that will require partial demolition of existing hardscapes and underground utilities, a full earthwork package, new utility and storm infrastructure, rework of existing detention ponds and new pond construction, and new asphalt and concrete paving. The site will be landscaped on all sides due to setback requirements. The project will be phased so certain aspects of the sitework package and new building construction will need to be coordinated for timing and logistics to keep the facility operating. The new buildings are primarily PEMB structures with a mix of masonry, metal panel cladding, and light gage framing. The largest of the new structures, the Out-Building, will include a full interior admin area complete with interior infrastructure and finishes. The remainder of the new PEMB structures will be a mix of covered parking structures, enclosed storage, and a Decant shed for liquids storage. The addition to the existing Admin building will be structural steel framing with load bearing CMU and exterior framing. There will be a new stranding seam metal roof to match the existing structure and a low TPO roof. This addition will be completely upfit on the interior.
Posted Date
Oct 22, 2025
Due Date
Jan 23, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Oct 22, 2025
Close: Jan 23, 2026
Seeking to pre-qualify contractors for subcontractor trade packages. The Varina Public Services Center project consists of new buildings along with an addition and partial renovation of their existing Administration building. This project includes a 15 acre site that will require partial demolition of existing hardscapes and underground utilities, a full earthwork package, new utility and storm infrastructure, rework of existing detention ponds and new pond construction, and new asphalt and concrete paving. The site will be landscaped on all sides due to setback requirements. The project will be phased so certain aspects of the sitework package and new building construction will need to be coordinated for timing and logistics to keep the facility operating. The new buildings are primarily PEMB structures with a mix of masonry, metal panel cladding, and light gage framing. The largest of the new structures, the Out-Building, will include a full interior admin area complete with interior infrastructure and finishes. The remainder of the new PEMB structures will be a mix of covered parking structures, enclosed storage, and a Decant shed for liquids storage. The addition to the existing Admin building will be structural steel framing with load bearing CMU and exterior framing. There will be a new stranding seam metal roof to match the existing structure and a low TPO roof. This addition will be completely upfit on the interior.
Provide new construction but not limited to: Rebuild, 1,400sqft building and 6 MPD stacked with DEF. Includes all site/structural demolition and development, utilities, concrete paving, fuel system removal and new system installation support, building/canopy foundations. Work includes demolition and environmental coordination, complete earthwork and grading, installation of storm, water, and sanitary systems, electrical and plumbing/mechanical infrastructure, and all GC responsibilities associated with modular building and canopy erection by Frey-Moss. The contractor will also provide required testing, inspections, documentation, and Murphy-specific GC scope items such as pump toppers, decals, interior specialties, and final cleaning.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Provide new construction but not limited to: Rebuild, 1,400sqft building and 6 MPD stacked with DEF. Includes all site/structural demolition and development, utilities, concrete paving, fuel system removal and new system installation support, building/canopy foundations. Work includes demolition and environmental coordination, complete earthwork and grading, installation of storm, water, and sanitary systems, electrical and plumbing/mechanical infrastructure, and all GC responsibilities associated with modular building and canopy erection by Frey-Moss. The contractor will also provide required testing, inspections, documentation, and Murphy-specific GC scope items such as pump toppers, decals, interior specialties, and final cleaning.
AvailableProvide service/parts & repairs for murphy controllers for use at various pump stations.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
Provide service/parts & repairs for murphy controllers for use at various pump stations.
AvailableWork consists of roof replacements for 7 multi-unit buildings located in the Eugene Murphy Elderly Housing Complex.
Posted Date
Jan 14, 2026
Due Date
Feb 4, 2026
Release: Jan 14, 2026
Close: Feb 4, 2026
Work consists of roof replacements for 7 multi-unit buildings located in the Eugene Murphy Elderly Housing Complex.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →