Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of the resurfacing of the municipal building parking lot.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes parking lot paving.
Posted Date
Dec 12, 2025
Due Date
Jan 13, 2026
Release: Dec 12, 2025
Close: Jan 13, 2026
Work includes parking lot paving.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD. Parking lot paving of approx. 767,342 SF across three campuses.
Posted Date
Dec 1, 2025
Due Date
Jan 28, 2026
Release: Dec 1, 2025
Close: Jan 28, 2026
DESIGN-BUILD. Parking lot paving of approx. 767,342 SF across three campuses.
AvailableWork consists of the reconstruction of the existing asphalt municipal parking lot and a separate alley and demolition, excavation, grading, subgrade preparation, base course placement, bituminous paving, pavement markings, curbing, concrete flatwork, storm sewer, site electrical work, and landscaping.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
Work consists of the reconstruction of the existing asphalt municipal parking lot and a separate alley and demolition, excavation, grading, subgrade preparation, base course placement, bituminous paving, pavement markings, curbing, concrete flatwork, storm sewer, site electrical work, and landscaping.
AvailableWork consists of paving an existing yard area with a combination of reinforced concrete paving and asphalt paving, the total site area measures approx 160' by 140', site preparation, placement of concrete pads, placement of asphalt paving.
Posted Date
Dec 16, 2025
Due Date
Jan 29, 2026
Release: Dec 16, 2025
Close: Jan 29, 2026
Work consists of paving an existing yard area with a combination of reinforced concrete paving and asphalt paving, the total site area measures approx 160' by 140', site preparation, placement of concrete pads, placement of asphalt paving.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →