Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
University or college mascot.
Full-time equivalent employees.
Graduation rate percentage.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Santa Barbara City College
Santa Barbara City College is soliciting bids for temporary use work to support cosmetology tenant improvements at its facility located at 419 State Street in Santa Barbara, CA. A pre-bid conference and job walk is scheduled for March 3, 2026 at 10:00 a.m. Pacific. Bids are due March 26, 2026 at 2:00 p.m. via electronic bidding through SBCC’s online planroom.
Posted Date
-
Due Date
Mar 26, 2026
Santa Barbara City College
Close: Mar 26, 2026
Santa Barbara City College is soliciting bids for temporary use work to support cosmetology tenant improvements at its facility located at 419 State Street in Santa Barbara, CA. A pre-bid conference and job walk is scheduled for March 3, 2026 at 10:00 a.m. Pacific. Bids are due March 26, 2026 at 2:00 p.m. via electronic bidding through SBCC’s online planroom.
AvailableSanta Barbara City College
DESIGN-BUILD. Parking lot paving of approx. 767,342 SF across three campuses.
Posted Date
Dec 1, 2025
Due Date
Feb 11, 2026
Release: Dec 1, 2025
Santa Barbara City College
Close: Feb 11, 2026
DESIGN-BUILD. Parking lot paving of approx. 767,342 SF across three campuses.
Santa Barbara City College
Work includes the interior soft demolition, as well as lead, asbestos and PCB abatement of an existing 74,000 SF physical education complex in preparation for the construction of a new 77,000 SF, Type IIA, 4-story physical education building.
Posted Date
Feb 12, 2025
Due Date
Mar 20, 2025
Release: Feb 12, 2025
Santa Barbara City College
Close: Mar 20, 2025
Work includes the interior soft demolition, as well as lead, asbestos and PCB abatement of an existing 74,000 SF physical education complex in preparation for the construction of a new 77,000 SF, Type IIA, 4-story physical education building.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $109,300, use sole source.
Coops: Start here—ask Purchasing to buy via an existing cooperative program with a single quote to expedite.
Entity: Santa Barbara City College (CA).
Practice: Rarely used above the competitive bidding threshold; expect high friction.
Track vendor wins and renewal opportunities
Santa Barbara City College
This Purchase Order (P0012413) details the agreement between Santa Barbara City College and Acadea for CurriQunet Support, Hosting, and Maintenance renewal. The service period is from December 1, 2025, to November 30, 2028, encompassing three fiscal years with annual license fees of $22,600.00, $27,600.00, and $32,600.00 respectively. The total contract value is $82,800.00. Standard terms and conditions apply.
Effective Date
Dec 1, 2025
Expires
Effective: Dec 1, 2025
Santa Barbara City College
Expires:
This Purchase Order (P0012413) details the agreement between Santa Barbara City College and Acadea for CurriQunet Support, Hosting, and Maintenance renewal. The service period is from December 1, 2025, to November 30, 2028, encompassing three fiscal years with annual license fees of $22,600.00, $27,600.00, and $32,600.00 respectively. The total contract value is $82,800.00. Standard terms and conditions apply.
AvailableSanta Barbara City College
This 3-year renewal agreement between Modern Campus and Santa Barbara City College (SBCC) covers the Omni CMS web content management system and a Basic Customer Success Package. Effective from July 1, 2021, to June 30, 2024, the agreement includes a license for unlimited authorized users and basic support with up to two designated contacts and unlimited tickets. The agreement outlines annual costs and payment terms, with a 5% annual license increase.
Effective Date
Jul 1, 2021
Expires
Effective: Jul 1, 2021
Santa Barbara City College
Expires:
This 3-year renewal agreement between Modern Campus and Santa Barbara City College (SBCC) covers the Omni CMS web content management system and a Basic Customer Success Package. Effective from July 1, 2021, to June 30, 2024, the agreement includes a license for unlimited authorized users and basic support with up to two designated contacts and unlimited tickets. The agreement outlines annual costs and payment terms, with a 5% annual license increase.
Santa Barbara City College
This Order Form (No. 1) between Modern Campus USA Inc. and Santa Barbara City College outlines the provision of CMS SaaS, CMS Emergency Alerts, and associated support services. The services commence on July 1, 2024, for an initial term of 12 months, with automatic annual renewals subject to a 5% price increase. The total cost for the first year, encompassing both subscription and support fees, is $47,400.00. The Order Form itself was executed on June 10, 2024.
Effective Date
Jul 1, 2024
Expires
Effective: Jul 1, 2024
Santa Barbara City College
Expires:
This Order Form (No. 1) between Modern Campus USA Inc. and Santa Barbara City College outlines the provision of CMS SaaS, CMS Emergency Alerts, and associated support services. The services commence on July 1, 2024, for an initial term of 12 months, with automatic annual renewals subject to a 5% price increase. The total cost for the first year, encompassing both subscription and support fees, is $47,400.00. The Order Form itself was executed on June 10, 2024.
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Santa Barbara City College
The meeting included discussions on club charters and grant requests, with $1500.00 approved for the Aerospace and Rocket Club. A committee was formed for Saturday Student Space. ASG agreed to test the Neo-Quad App for 3 weeks and provide feedback via surveys. Committees provided updates, including the By-Laws and Standing Rules Amendment Committee, Town Hall Event Committee, Halloween Event Committee, Student Equity Plan Committee, Housing and Internships Committee, and Volleyball Tournament Fundraiser Committee.
The meeting included discussions and decisions on various club charters and grant requests. A fundraising proposal was presented involving a volleyball tournament, and a committee was formed to oversee the event. Committees were also established or discussed for by-laws amendment, a town hall event, a Halloween event, and student equity, housing and internships. Reports were given by various members including the President, Vice Presidents, Student Advocate, Student Trustee, and Commissioners.
The budget forum discussed the district's financial history, including revenue trends, FTE declines, and the implications of one-time funds. It addressed the budget development process, the May revise assumptions, and specific numbers related to the unrestricted general fund. Key topics included the Campus Center replacement project, efforts to pass a bond, and the impact of the supplemental early retirement plan (SERP). The forum also covered FTE projections, expenditure assumptions, health benefit costs, and pension contributions, as well as the establishment of a budget resource allocation committee.
The discussion revolves around the facilities master planning process at Santa Barbara City College. The facilities master plan is a required document for college accreditation. The plan addresses space needs, student numbers, and potential facility changes to meet programmatic needs. The discussion includes the importance of student-centered hubs, the decision not to move career technology education programs to the Waite campus, and changes occurring at the Schott and Wake campuses due to the implementation of the school of extended learning.
The meeting included a presentation by SBCC Superintendent President Dr. Erika Endrijonas, who discussed student surveys on scheduling modalities, mental health, and campus climate. A Student Equity Plan was proposed, and a committee was formed. The ASG budget was approved. A town hall event was discussed and approved with a budget of $60, and co-chairs were assigned. A fundraising proposal was presented, and Academic Senate Proposals regarding Student Equity/Housing and Internships were discussed, leading to the formation of a committee. A Halloween event was also discussed, and a committee was established.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Santa Barbara City College's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant Superintendent / Vice President of Student Affairs
Premium
Access the largest public sector contact database