Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include replace the existing single span bridge with a new kytc standard drawing single span composite box beam bridge and reconstruct the roadway approach to the proposed bridge.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Redding, California is soliciting proposals for construction management services for the Westside Road Bridge Over Canyon Hollow Creek Replacement Project.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
The City of Redding, California is soliciting proposals for construction management services for the Westside Road Bridge Over Canyon Hollow Creek Replacement Project.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes the Westside Road bridge replacement and approach roadway. Major work includes, but is not limited to: 1. Removal of the existing bridge in stages 2. Construction of a new bridge to be completed over two construction seasons 3. Road construction work 4. Sidewalks, curb and gutter 5. Traffic control and traffic handling 6. Utility coordination, relocations and installation 7. Storm water pollution control.
Posted Date
Nov 20, 2025
Due Date
Jan 22, 2026
Release: Nov 20, 2025
Close: Jan 22, 2026
Work includes the Westside Road bridge replacement and approach roadway. Major work includes, but is not limited to: 1. Removal of the existing bridge in stages 2. Construction of a new bridge to be completed over two construction seasons 3. Road construction work 4. Sidewalks, curb and gutter 5. Traffic control and traffic handling 6. Utility coordination, relocations and installation 7. Storm water pollution control.
AvailableWork includes, but is not limited to constructing a new three-span reinforced concrete flat slab bridge approx. 400' long and 28' wide, demolition and disposal of the existing reinforced concrete bridge, temporarily diverting cache creek, cast-in-drilled-hole concrete piles, imported earth fill for new roadway approaches, bridge railing, furnishing water quality monitoring and qualified biological monitoring services, and installing rock slope protection.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Work includes, but is not limited to constructing a new three-span reinforced concrete flat slab bridge approx. 400' long and 28' wide, demolition and disposal of the existing reinforced concrete bridge, temporarily diverting cache creek, cast-in-drilled-hole concrete piles, imported earth fill for new roadway approaches, bridge railing, furnishing water quality monitoring and qualified biological monitoring services, and installing rock slope protection.
AvailableClose: Jan 30, 2026
Bridge replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →