Closing soon

Mountain View Road Slide Repair

Description: Work include 4,593 CY class 1 excavation; 480 LF saw cutting; 2,276 SY superpave asphalt mixture design, wearing course; 1,016 SY superpave asphalt mixture design, binder course; 3,292 SY asphalt tack coat; 1,235 SY milling of asphalt pavement surface, 1 1/2" depth; 942 LF remove existing guide rail; 463 LF type 31-s guide rail with 8' extra length posts; 3,632 LF 6" white waterborne pavement markings modified; 3,632 4" yellow waterborne pavement markings modified; 49 SY asphalt driveway adjustment.

Released
Aug 27, 2026
Closes
Sep 17, 2026(7 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts