Summary
Improve pedestrian accessibility. The following are the general items of work required: A.Project mobilization and demobilization of all necessary construction/project equipment and/or temporary structures.
B.Remove and replace existing concrete sidewalk. Install cheek walls.
C.Remove and replace existing concrete curb. D.Sawcut and remove existing asphalt surface and extend concrete sidewalk. E.Remove and replace existing ADA accessible ramps. F.Install new ADA accessible ramps. Install check wall. G.Mill and overlay along Waring Drive and Delaware Avenue. H.Install crosswalk, stop bar, and parking space pavement markings. I.Furnish and place topsoil, and fine grade, seed and mulch all disturbed areas.