Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Clayton is soliciting preparation of construction plans for sidewalk improvements along North Main Street (State Route 48) between Heathcliff Road and the City of Clayton north corporation limit. The work includes design of sidewalks, curb and storm sewer, bicycle facilities, limited traffic signal and lighting design, and right-of-way plan development with an estimated construction cost of $4,659,365. The anticipated authorization to proceed with the selected consultant is March 6, 2026, and construction is estimated between Jan 30, 2029 and Jan 25, 2030.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the preparation of construction plans for sidewalk improvements along North Main Street (State Route 48) between Heathcliff Road and the City of Clayton north corporation limit.
Posted Date
Jan 12, 2026
Due Date
Feb 6, 2026
Release: Jan 12, 2026
Close: Feb 6, 2026
This RFP is for the preparation of construction plans for sidewalk improvements along North Main Street (State Route 48) between Heathcliff Road and the City of Clayton north corporation limit.
AvailableWork includes 50 SY pavement repair; 77,838 SY pavement planing, asphalt concrete; 6,616 GAL non-tracking tack coat; 17 CY traffic compacted surface, type a; 3,243 CY asphalt concrete, surface course; 5,060 GAL special - asphalt rejuvenating agent; 25,661 LF void reducing asphalt membrane (vram); 9.72 mile edge line, 4", type 1.
Posted Date
Jan 2, 2026
Due Date
Jan 28, 2026
Release: Jan 2, 2026
Close: Jan 28, 2026
Work includes 50 SY pavement repair; 77,838 SY pavement planing, asphalt concrete; 6,616 GAL non-tracking tack coat; 17 CY traffic compacted surface, type a; 3,243 CY asphalt concrete, surface course; 5,060 GAL special - asphalt rejuvenating agent; 25,661 LF void reducing asphalt membrane (vram); 9.72 mile edge line, 4", type 1.
AvailableThe solicitation SPE4A626T521V (28--SHAFT,BEARING) from Defense Logistics Agency (DLA Aviation) requests quotes to supply NSN 2835010537793 (shaft, bearing) in two line items (Qty 290 and Qty 1) for delivery to DLA Distribution Depot Hill. Quotes must be submitted electronically and the procurement is a Combined Synopsis/Solicitation open to all responsible sources. The posting was published on 2026-01-20 and bids are due on 2026-01-28; primary solicitation documents are available on the DIBBS buyer portal.
Posted Date
Jan 20, 2026
Due Date
Jan 28, 2026
Release: Jan 20, 2026
Close: Jan 28, 2026
The solicitation SPE4A626T521V (28--SHAFT,BEARING) from Defense Logistics Agency (DLA Aviation) requests quotes to supply NSN 2835010537793 (shaft, bearing) in two line items (Qty 290 and Qty 1) for delivery to DLA Distribution Depot Hill. Quotes must be submitted electronically and the procurement is a Combined Synopsis/Solicitation open to all responsible sources. The posting was published on 2026-01-20 and bids are due on 2026-01-28; primary solicitation documents are available on the DIBBS buyer portal.
Work includes 1 LS clearing and grubbing, including tree/stump removal (<12"); 1 EA tree & stump removal, 12"-23"; 550 CY excavation and embankment; 33,942 SY pavement planing, asphalt concrete; 6 TN asphalt concrete base (449); 11 TN aggregate base; 6,797 GAL non-tracking tack coat; 2,866 TN asphalt concrete surface course, type 1 (449), pg64-22 (1.5"); 580 SF 6" concrete sidewalk; 1,255 SF 6" concrete curb ramp; 345 sf asphalt driveway; 1 EA manhole, odot no 3, 48" precast base; 2 EA manhole adjusted to grade, type 2b; 67 SF sign erected, flat sheet; 1,160 LF lane line, 4" white dashed; 960 LF crosswalk line, 12"; 2,431 SY seeding and mulching.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Work includes 1 LS clearing and grubbing, including tree/stump removal (<12"); 1 EA tree & stump removal, 12"-23"; 550 CY excavation and embankment; 33,942 SY pavement planing, asphalt concrete; 6 TN asphalt concrete base (449); 11 TN aggregate base; 6,797 GAL non-tracking tack coat; 2,866 TN asphalt concrete surface course, type 1 (449), pg64-22 (1.5"); 580 SF 6" concrete sidewalk; 1,255 SF 6" concrete curb ramp; 345 sf asphalt driveway; 1 EA manhole, odot no 3, 48" precast base; 2 EA manhole adjusted to grade, type 2b; 67 SF sign erected, flat sheet; 1,160 LF lane line, 4" white dashed; 960 LF crosswalk line, 12"; 2,431 SY seeding and mulching.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis