Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS clearing and grubbing, including tree/stump removal (<12"); 1 EA tree & stump removal, 12"-23"; 550 CY excavation and embankment; 33,942 SY pavement planing, asphalt concrete; 6 TN asphalt concrete base (449); 11 TN aggregate base; 6,797 GAL non-tracking tack coat; 2,866 TN asphalt concrete surface course, type 1 (449), pg64-22 (1.5"); 580 SF 6" concrete sidewalk; 1,255 SF 6" concrete curb ramp; 345 sf asphalt driveway; 1 EA manhole, odot no 3, 48" precast base; 2 EA manhole adjusted to grade, type 2b; 67 SF sign erected, flat sheet; 1,160 LF lane line, 4" white dashed; 960 LF crosswalk line, 12"; 2,431 SY seeding and mulching.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Various road material and various road improvements.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
Various road material and various road improvements.
AvailableRelease: -
Close: Feb 4, 2026
Work includes boulevard improvements.
AvailableThe Project generally consists of the following Construction Contract: Contract No. 1 Marshall MU WTP Residuals Improvements. Replacement of the sludge press control panels and replacement of the residuals building air compressor and air dryer.
Posted Date
Jan 20, 2026
Due Date
Feb 17, 2026
Release: Jan 20, 2026
Close: Feb 17, 2026
The Project generally consists of the following Construction Contract: Contract No. 1 Marshall MU WTP Residuals Improvements. Replacement of the sludge press control panels and replacement of the residuals building air compressor and air dryer.
AvailableRoad Improvements.
Posted Date
Jan 8, 2026
Due Date
Feb 12, 2026
Release: Jan 8, 2026
Close: Feb 12, 2026
Road Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis