23089-0043-NS-Range Remediation RFP
Work includes Abatement of Lead contaminated surfaces in basement.
Description: Work includes 93,836 CY of excavation, classes 1, 1A, 2 & 4; 27,914 CY of common borrow excavation; 8,496 CY of select borrow excavation, various types; 39,918 SY of superpave asphalt materials (base, binder & wearing courses); 19,380 sy of subbase no. 2a, various depths; 5,276 LF of drainage pipe, various types and sizes; 3,342 LF of 6" pavement base drain; 69 EA of inlets, endwalls, manholes various types; 2,787.5 LF of guiderail, type 31-S various types; 29,535 CY of class 3 excavation; 5,647 CY of class a cement concrete; 571 CY of class AA cement concrete, except use no. 8 coarse aggregate; 446 CY of class AA cement concrete; 6 CY of class AAAP cement concrete, except use no. 8 coarse aggregate; 2,379 CY of class AAAP cement concrete. See attached file.
StateAgency · PA, US
Adjacent opportunities open for bidding right now.
University of Utah U Facilities Office
Higher EducationUT
Posted
Sep 24, 2026
Nov 12, 2026
Work includes Abatement of Lead contaminated surfaces in basement.
Florida Department of Transportation
State AgencyFL
Posted
Oct 30, 2026
Nov 9, 2026
This is an RRR project focused on preserving and extending the life of existing pavement along SR 826/Palmetto Expressway. The work involves removing asphalt, concrete, and bitumens. It also includes paving and resurfacing.
Pennsylvania Department of Transportation
State AgencyPA
Posted
-
Jun 30, 2027
Preliminary engineering services for SR 2065, Section A10, Thompson Run Rd & Old William Penn Hwy Bridges, specifically completing preliminary engineering with alternative 3 for Part 1.
FederalVA
Posted
Nov 4, 2026
Nov 16, 2026
DLA Aviation at Philadelphia requests quotations for four radome sections, NSN 5985016204129, part number P8ME05606-101. This unrestricted supplies procurement seeks a firm-fixed-price contract with delivery within 90 calendar days after award. No drawings are available for this request for quotation.
Decision makers connected to this RFP from Pennsylvania Turnpike Commission.
From the first pre-RFP signals to the published RFP and its files.
Annual financial report
The FY2025 annual report recorded that final design was proceeding on the southern Mon/Fayette section, with the next portion planned to bid in late 2025.
Four projects constructed as part of the Mon/Fayette Expressway are now in operation. One is an approximately six-mile toll road between I-70 and U.S. Route 40 in Washington County. This project was built by PennDOT and turned over to the Commission upon its opening in 1990. The second is an approximately twelve-mile section of toll road from I-68 near…
Pennsylvania Turnpike Commission Annual Comprehensive Financial Report FY2025
Annual financial report · Oct 7, 2025
Board meeting
The Commission approved continued open-end construction-inspection services for Mon/Fayette Expressway expansion projects from PA Route 51 to PA Route 837 through December 31, 2029.
SUPPLEMENTS Motion-That the Commission approve the negotiation and execution of Supplemental Agreements for the items listed in memos "a" through "c": MINUTES OF THE MEETING -- October 21, 2025 3 \| P a g e a. Supplemental Agreement #5 for Contract #T-129.00T001-2 with JMT, Inc. for the Total Reconstruction and Widening project at MP 131.00 through MP…
Board meeting
The Pennsylvania Turnpike Commission approved advertising for Mon/Fayette Expressway SR 0043 Section 53C3 between MP M-51.52 and MP M-55.35.
ADVERTISING Motion-That the Commission approve advertising for the Mon/Fayette Expressway, SR 0043, Section 53C3 between MP M-51.52 and MP M-55.35. -was made by Commissioner Farnham, seconded by Commissioner Leaphart, and passed unanimously.
Pennsylvania Turnpike Commission Commission Meeting Minutes
Board meeting · Sep 1, 2026
Board meeting
The Pennsylvania Turnpike Commission approved an additional $2,000,000 for HDR design management services through bidding and construction of Section 53-C3, raising the contract ceiling to $36,200,000.
SUPPLEMENTS Motion-That the Commission approve the negotiation and execution of the Supplemental Agreements for the items listed in memos "a" and "b": a. Supplemental Agreement #2 for design engineering services and post design services for the Lafayette Street Interchange project at MP 331.60 with KCI Technologies, Inc., for an additional $3,500,000.00 for…
Pennsylvania Turnpike Commission Commission Meeting Minutes
Board meeting · Sep 1, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (47 days left)
Pennsylvania Turnpike Commission Commission Meeting
Board meeting · Oct 21, 2025