Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Battelle/PNNL (for the Department of Energy) is requesting proposals to produce a mockup Battery Energy Storage System to be delivered/installed for work performed in Richland, WA. The solicitation (No. 923072) was posted on 2025-12-19 and is open with a response deadline of 2026-01-30 7:00 p.m. EST (2026-01-31T00:00:00Z). This is a single solicitation (not a grant) with NAICS 335910 and PSC 1290.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Qualified contractors for the design, installation, and operation of a turnkey Photovoltaic (PV) solar power system integrated with a Battery Energy Storage System (BESS).
Posted Date
Oct 16, 2025
Due Date
Jan 20, 2026
Release: Oct 16, 2025
Close: Jan 20, 2026
Qualified contractors for the design, installation, and operation of a turnkey Photovoltaic (PV) solar power system integrated with a Battery Energy Storage System (BESS).
AvailableThe Town of Tiburon is soliciting proposals for a Battery Energy Storage System (BESS) at the Tiburon Police Station to enhance energy resilience and operations. Qualified vendors are expected to furnish, install, integrate, and commission a turnkey system consistent with the Town’s specifications via the BidNet Direct portal. Proposals are due January 15, 2026, at 5:00 PM Pacific Time.
Posted Date
Dec 19, 2025
Due Date
Jan 16, 2026
Release: Dec 19, 2025
Close: Jan 16, 2026
The Town of Tiburon is soliciting proposals for a Battery Energy Storage System (BESS) at the Tiburon Police Station to enhance energy resilience and operations. Qualified vendors are expected to furnish, install, integrate, and commission a turnkey system consistent with the Town’s specifications via the BidNet Direct portal. Proposals are due January 15, 2026, at 5:00 PM Pacific Time.
The City of Santa Barbara is soliciting proposals to design, build, own, operate, and maintain a solar photovoltaic (PV) system and battery energy storage system (BESS) at the Plaza Vera Cruz Community Building (130 E. Cota St.). The selected provider will enter a 25-year Power Purchase Agreement (PPA) to supply as much of the facility’s energy load as possible with on-site renewable power at the lowest possible cost to the City. The solicitation is an RFP (not a grant), includes a non-mandatory pre-bid conference on 2026-01-06, and is managed through the City’s PlanetBids portal.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
The City of Santa Barbara is soliciting proposals to design, build, own, operate, and maintain a solar photovoltaic (PV) system and battery energy storage system (BESS) at the Plaza Vera Cruz Community Building (130 E. Cota St.). The selected provider will enter a 25-year Power Purchase Agreement (PPA) to supply as much of the facility’s energy load as possible with on-site renewable power at the lowest possible cost to the City. The solicitation is an RFP (not a grant), includes a non-mandatory pre-bid conference on 2026-01-06, and is managed through the City’s PlanetBids portal.
The City of Santa Barbara is soliciting proposals to design, build, own, operate, and maintain a solar photovoltaic (PV) system and battery energy storage system (BESS) at the Plaza Vera Cruz Community Building (130 E. Cota St.). The selected provider will enter a 25-year Power Purchase Agreement (PPA) to supply as much of the facility’s energy load as possible with on-site renewable power at the lowest possible cost to the City. The solicitation is an RFP (not a grant), includes a non-mandatory pre-bid conference on 2026-01-06, and is managed through the City’s PlanetBids portal.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
The City of Santa Barbara is soliciting proposals to design, build, own, operate, and maintain a solar photovoltaic (PV) system and battery energy storage system (BESS) at the Plaza Vera Cruz Community Building (130 E. Cota St.). The selected provider will enter a 25-year Power Purchase Agreement (PPA) to supply as much of the facility’s energy load as possible with on-site renewable power at the lowest possible cost to the City. The solicitation is an RFP (not a grant), includes a non-mandatory pre-bid conference on 2026-01-06, and is managed through the City’s PlanetBids portal.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →