Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Water treatment plant expansion.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide water treatment plant (SEWTP) expansion to 24MGD.
Posted Date
Jan 7, 2026
Due Date
Jan 23, 2026
Release: Jan 7, 2026
Close: Jan 23, 2026
Provide water treatment plant (SEWTP) expansion to 24MGD.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : water treatment plant upgrades to 5 mgd capacity; installation of plate settlers to existing sedimentation basins; installation of membrane filtration systems and building; abandonment of existing gravity filters; installation of two 500,000 gal above ground storage tanks for clearwells; extend sedimentation basin divider wall to create break tank; see attached file.
Posted Date
Nov 14, 2025
Due Date
Jan 22, 2026
Release: Nov 14, 2025
Close: Jan 22, 2026
Work includes : water treatment plant upgrades to 5 mgd capacity; installation of plate settlers to existing sedimentation basins; installation of membrane filtration systems and building; abandonment of existing gravity filters; installation of two 500,000 gal above ground storage tanks for clearwells; extend sedimentation basin divider wall to create break tank; see attached file.
AvailableConstruction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
Construction of wastewater treatment plant expansion.
AvailableThe Town of Orleans (MA) is soliciting qualifications from firms to provide architectural and design services for the Water Treatment Plant Expansion. A pre-bid conference is scheduled for January 13, 2026 at 11:00 AM at the Water Treatment Plant (350 South Orleans Rd.). Submittals are due January 30, 2026 by 3:00 PM local time; project documents are available by registering on the Town of Orleans bids page.
Posted Date
Dec 23, 2025
Due Date
Jan 30, 2026
Release: Dec 23, 2025
Close: Jan 30, 2026
The Town of Orleans (MA) is soliciting qualifications from firms to provide architectural and design services for the Water Treatment Plant Expansion. A pre-bid conference is scheduled for January 13, 2026 at 11:00 AM at the Water Treatment Plant (350 South Orleans Rd.). Submittals are due January 30, 2026 by 3:00 PM local time; project documents are available by registering on the Town of Orleans bids page.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →