Summary
Residuals and emerging contaminants improvements. Contactor and EQ basins, including, but not limited to excavation and shoring, structural concrete complete, structural steel, misc metals, backfill and grading. Dewatering and hard-rock excavation as needed. Process mechanical piping and equipment complete. Process piping to extend approximately 20 LF outside of structure, includes concrete pipe encasement. Connection to mechanical piping and site piping beyond by others. Waterproofing or other coatings to interior or exterior of structure, as required. Hvac and plumbing are included. Coating and labeling of exposed mechanical piping is included. Electrical and i&c by others. Installation of in-line instrumentation is included in this package, supply of said instrumentation by others.