Retrieving RFP details
Release
Close
U.S. Army Engineer District New Orleans
The work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approx. 2.25 million CY of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge. The work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approx. 2.25 million CY of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge.
U.S. Army Engineer District New Orleans
The work consists of the removal and satisfactory disposal of all material excavated from the Channel.
U.S. Army Engineer District New Orleans
The work consists of the removal and satisfactory disposal of dredged material excavated from the Tiger Pass Bar Channel and identification of utilities, within the limits shown on the contract drawings.
U.S. Army Engineer District New Orleans
The work consists of satisfactory removal and disposal of shoal material from within the channel limits as shown on the contract drawings, with disposal of dredged material into single point discharge locations delineated adjacent to the channel.
Release
Jul 16, 2025
Close
Jul 16, 2027