CityMA
Posted
Sep 28, 2026
Oct 28, 2026
Misc. Resurfacing (M26-3) / DPW
Trench excavation and backfill, furnish and install 18" rcp, 5' manhole base, rebuild catch basin, manhole adjustment.
Description: Trench excavation and backfill, furnish and install 18" rcp, 5' manhole base, rebuild catch basin, manhole adjustment.
City · MA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityMA
Posted
Sep 28, 2026
Oct 28, 2026
Trench excavation and backfill, furnish and install 18" rcp, 5' manhole base, rebuild catch basin, manhole adjustment.
CityMA
Posted
Sep 29, 2026
Oct 28, 2026
Misc. sidewalk reconstruction.
CityMA
Posted
Sep 29, 2026
Oct 28, 2026
Misc. sidewalk reconstruction.
Atlantic Cape Community College
Higher EducationNJ
Posted
Sep 29, 2026
Oct 15, 2026
The project generally consists of the milling of approximately 18,240 square feet of existing asphalt and resurfacing with approximately 2,255 tons of bituminous pavement in two parking lots. The work also includes ancillary stormwater retrofit improvements, concrete curb and apron work, pavement markings, and parking lot striping, together with all labor, materials, equipment, and related work necessary for a complete project
Decision makers connected to this RFP from City of Worcester.