Summary
Install an electric vehicle charging station at the site of an existing convenience market and construction of sidewalk along a portion of the adjacent public right-of-way. The work associated with the electric vehicle charging station includes installing erosion control measures, minor demolition, clearing, grubbing, grading, placing and compacting fill, concrete paving, and sidewalk with associated aggregate base, gravel surfacing, bollards, pavement
markings, and sign installation. Electrical work includes the installation of one (1) new Level 3 charging station (furnished by Lewis County Transit) and a new electrical service to the charging
station. The contractor shall coordinate with Lewis County PUD to install the new service. Sundry electrical work includes furnishing and installing a concrete base for the charging station, trenching
for electric conduits, and furnishing and installing electrical service panels on exterior mounting. Sidewalk construction in the adjacent County right-of-way includes installing erosion control
devices, minor demolition including sawcutting, removal and disposal of existing sidewalk, curb, gutter, and asphalt pavement, clearing, grubbing, grading, and placing and compacting fill. Approx. 100 SF of new cast-in-place concrete sidewalk are to be constructed with
an ADA-compliant curb ramp with detectable warning surface. The adjacent curb and gutter are to be replaced with new cast-in-place curb and gutter. Pavement patching and other miscellaneous
restoration of the roadway surface and surroundings are incidental to the work.