Summary
Work includes 2 EA roadway barricades; 8,800 CY roadway excavation and grading (f); 1 EA remove tree; 3,300 SF remove concrete; 14,1000 sf clearing and grubbing; 1 EA remove ex.fire hydrant; 1 EA remove ex. Bollard; 990 LF remove electrical/telecom conduits and facilities; 5 EA remove catch basin; 850 LF remove storm drain pipe; 90 LF remove 8" sewer line; 150 LF remove 12" water line; 440 LF remove 8" water line; 50 LF remove 4" water line; 1,100 LF removal and abandonment of water facilities; 320 LF 12" reinforced concrete pipe (rcp); 80 LF 4" pvc; 40 LF 8" hdpe (storm drain); 10 EA install 18" x 18" concrete drain inlet. See outside link.