Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Stabilize 1,600 LF of eroding shoreline using a living shorelines approach. Project will implement a living shoreline approach—using coir logs, rock sill structures, and the establishment of roughly 0.88 acres of tidal marsh behind the sill system—to enhance resilience, reduce erosion, and restore ecological function. Construction will occur within an estimated 2.28-acre disturbance area, including 0.82 acres above tidal wetlands.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide a living shoreline system to enhance resilience and protect the transfer station and provide environmental benefits. Mobilization and demobilization; maintenance of traffic (furnish and install); temporary staging area erosion and sediment control (furnish and install); floating turbidity barrier (furnish and install); soil tracking prevention device; 4,788 sf living shoreline creation and shoreline stabilization base material (furnish and install); 10,052 sf living shoreline plantings (furnish and install); 460 ea shoreline stabilization measures (furnish and install); construction surveys; rehabilitation of temporary staging area to original condition; 4,273 sf equivalent shoreline stabilization measures (furnish and install). See outside link.
Posted Date
Oct 23, 2025
Due Date
Jan 6, 2026
Release: Oct 23, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 6, 2026
Provide a living shoreline system to enhance resilience and protect the transfer station and provide environmental benefits. Mobilization and demobilization; maintenance of traffic (furnish and install); temporary staging area erosion and sediment control (furnish and install); floating turbidity barrier (furnish and install); soil tracking prevention device; 4,788 sf living shoreline creation and shoreline stabilization base material (furnish and install); 10,052 sf living shoreline plantings (furnish and install); 460 ea shoreline stabilization measures (furnish and install); construction surveys; rehabilitation of temporary staging area to original condition; 4,273 sf equivalent shoreline stabilization measures (furnish and install). See outside link.
AvailableWork generally consists of the construction a shingle beach, living shoreline plantings, and e&s controls.
Posted Date
Dec 30, 2025
Due Date
Jan 20, 2026
Release: Dec 30, 2025
Close: Jan 20, 2026
Work generally consists of the construction a shingle beach, living shoreline plantings, and e&s controls.
AvailableProvide temporary facilities and controls to allow for construction, operations and access to park facilities by oprhp staff and patrons. Provide general site demolition, salvage, removals, and disposals. Furnish and install and maintain temporary tree protection measures. Pave accessible route to fishing pier from the mott avenue park entrance. Regrade and construct living shorelines comprised of breakwater systems and plantings. Remove invasive species using mechanical and chemical treatments as defined by the construction documents. Plant approved species in the low marsh, high marsh, coastal meadow, coastal forest, and lawn. Construct new boardwalks and a fishing pier.
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
Provide temporary facilities and controls to allow for construction, operations and access to park facilities by oprhp staff and patrons. Provide general site demolition, salvage, removals, and disposals. Furnish and install and maintain temporary tree protection measures. Pave accessible route to fishing pier from the mott avenue park entrance. Regrade and construct living shorelines comprised of breakwater systems and plantings. Remove invasive species using mechanical and chemical treatments as defined by the construction documents. Plant approved species in the low marsh, high marsh, coastal meadow, coastal forest, and lawn. Construct new boardwalks and a fishing pier.
AvailableWork includes restore and enhance the performance of the existing breakwater within its original footprint, while integrating nature-based solutions to protect the interior shoreline, reduce flood risk, and improve water quality and nearshore habitat conditions.
Posted Date
Oct 26, 2025
Due Date
Jan 7, 2026
Release: Oct 26, 2025
Close: Jan 7, 2026
Work includes restore and enhance the performance of the existing breakwater within its original footprint, while integrating nature-based solutions to protect the interior shoreline, reduce flood risk, and improve water quality and nearshore habitat conditions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →