Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes restore and enhance the performance of the existing breakwater within its original footprint, while integrating nature-based solutions to protect the interior shoreline, reduce flood risk, and improve water quality and nearshore habitat conditions.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide a living shoreline system to enhance resilience and protect the transfer station and provide environmental benefits. Mobilization and demobilization; maintenance of traffic (furnish and install); temporary staging area erosion and sediment control (furnish and install); floating turbidity barrier (furnish and install); soil tracking prevention device; 4,788 sf living shoreline creation and shoreline stabilization base material (furnish and install); 10,052 sf living shoreline plantings (furnish and install); 460 ea shoreline stabilization measures (furnish and install); construction surveys; rehabilitation of temporary staging area to original condition; 4,273 sf equivalent shoreline stabilization measures (furnish and install). See outside link.
Posted Date
Oct 23, 2025
Due Date
Jan 6, 2026
Release: Oct 23, 2025
Close: Jan 6, 2026
Provide a living shoreline system to enhance resilience and protect the transfer station and provide environmental benefits. Mobilization and demobilization; maintenance of traffic (furnish and install); temporary staging area erosion and sediment control (furnish and install); floating turbidity barrier (furnish and install); soil tracking prevention device; 4,788 sf living shoreline creation and shoreline stabilization base material (furnish and install); 10,052 sf living shoreline plantings (furnish and install); 460 ea shoreline stabilization measures (furnish and install); construction surveys; rehabilitation of temporary staging area to original condition; 4,273 sf equivalent shoreline stabilization measures (furnish and install). See outside link.
AvailableComplete repair of the west breakwater. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approx. 45,000 CY of sediment will be dredged for access to the breakwater.
Posted Date
Apr 10, 2025
Due Date
Jan 19, 2026
Release: Apr 10, 2025
Close: Jan 19, 2026
Complete repair of the west breakwater. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approx. 45,000 CY of sediment will be dredged for access to the breakwater.
AvailablePerforming all Work required for conducting surveys; protection of the environment, excavation, construction of approx. 2,100 LF of rock breakwater and 920 LF of reef breakwater, mechanical excavation two upland borrow sources, installing approximately 9,810 CY of fill material for marsh creation, and planting approx. 2.0 AC of low marsh species.
Posted Date
Nov 26, 2025
Due Date
Jan 16, 2026
Release: Nov 26, 2025
Close: Jan 16, 2026
Performing all Work required for conducting surveys; protection of the environment, excavation, construction of approx. 2,100 LF of rock breakwater and 920 LF of reef breakwater, mechanical excavation two upland borrow sources, installing approximately 9,810 CY of fill material for marsh creation, and planting approx. 2.0 AC of low marsh species.
AvailableThe Dana Point West Breakwater Repair Project involves replacing displaced armor stone, resetting existing stone, and dredging approximately 45,000 cubic yards of sediment for nearshore nourishment. This is a competitive Firm-Fixed Price contract with an estimated value between $5,000,000 and $10,000,000, and a performance period of 308 calendar days. The official Invitation for Bid is available via Contract Opportunities (SAM.gov), with a direct link provided by the aggregator for full documentation.
Posted Date
Dec 2, 2025
Due Date
Jan 19, 2026
Release: Dec 2, 2025
Close: Jan 19, 2026
The Dana Point West Breakwater Repair Project involves replacing displaced armor stone, resetting existing stone, and dredging approximately 45,000 cubic yards of sediment for nearshore nourishment. This is a competitive Firm-Fixed Price contract with an estimated value between $5,000,000 and $10,000,000, and a performance period of 308 calendar days. The official Invitation for Bid is available via Contract Opportunities (SAM.gov), with a direct link provided by the aggregator for full documentation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis