Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Dana Point West Breakwater Repair Project involves replacing displaced armor stone, resetting existing stone, and dredging approximately 45,000 cubic yards of sediment for nearshore nourishment. This is a competitive Firm-Fixed Price contract with an estimated value between $5,000,000 and $10,000,000, and a performance period of 308 calendar days. The official Invitation for Bid is available via Contract Opportunities (SAM.gov), with a direct link provided by the aggregator for full documentation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Complete repair of the west breakwater. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approx. 45,000 CY of sediment will be dredged for access to the breakwater.
Posted Date
Apr 10, 2025
Due Date
Jan 19, 2026
Release: Apr 10, 2025
Close: Jan 19, 2026
Complete repair of the west breakwater. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approx. 45,000 CY of sediment will be dredged for access to the breakwater.
AvailablePremium
Access the largest public sector contact database
The breakwater is critical for harbor protection and safe navigation. The project will restore the structural integrity of the breakwater, which has experienced significant deterioration due to age and environmental conditions.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
The breakwater is critical for harbor protection and safe navigation. The project will restore the structural integrity of the breakwater, which has experienced significant deterioration due to age and environmental conditions.
AvailableWork includes restore and enhance the performance of the existing breakwater within its original footprint, while integrating nature-based solutions to protect the interior shoreline, reduce flood risk, and improve water quality and nearshore habitat conditions.
Posted Date
Oct 26, 2025
Due Date
Jan 7, 2026
Release: Oct 26, 2025
Close: Jan 7, 2026
Work includes restore and enhance the performance of the existing breakwater within its original footprint, while integrating nature-based solutions to protect the interior shoreline, reduce flood risk, and improve water quality and nearshore habitat conditions.
AvailableRepair project is to conduct maintenance repairs of the rubble mound breakwater by resetting existing stone in damaged areas from the root to the head of the structure, and to provide new stones as needed in some locations. He major elements of this project include: pre-mobilization activities; compliance with all applicable environmental requirements; mobilization, which includes preparation of temporary construction staging; acquiring and delivering needed stone to the site; repair of the damaged areas; replacement of a concrete slab pedestal for the aid to navigation; and demobilization, which includes the restoration of the temporary construction staging area to its original condition.
Posted Date
Dec 10, 2025
Due Date
Dec 24, 2025
Release: Dec 10, 2025
Close: Dec 24, 2025
Repair project is to conduct maintenance repairs of the rubble mound breakwater by resetting existing stone in damaged areas from the root to the head of the structure, and to provide new stones as needed in some locations. He major elements of this project include: pre-mobilization activities; compliance with all applicable environmental requirements; mobilization, which includes preparation of temporary construction staging; acquiring and delivering needed stone to the site; repair of the damaged areas; replacement of a concrete slab pedestal for the aid to navigation; and demobilization, which includes the restoration of the temporary construction staging area to its original condition.