FederalDC
Posted
Aug 28, 2026
Sep 27, 2026
KPSFS Power Plant Automatic Control System
Kaena Point Space Force Station has a critical requirement for highly specialized engineering labor, troubleshooting, and software repair services for the failed Power Plant Automatic Control System (ACS). The contractor must assess, test, evaluate, troubleshoot, and repair the localized, closed-loop computer logic controller that operates the installation's emergency automatic control system. The repaired system must achieve automated outage sensing and transfer critical satellite-tracking mission loads to emergency backup generators within approximately 30 seconds of a commercial grid failure; SAM.gov identifies this as an active Contract Opportunity rather than a grant.