Summary
Work includes 2,100 LF removing guardrail, 18 EA removing guardrail end anchor, 6,724 gal tack coat, 64,822 SY micro-milling existing pavement (approx 1.10" thru 2.00" thick), material remixing device, superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range c/d 5,349 Ton, superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range c/d 199 Ton, superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range c/d 1,000 Ton, 488 Ton aggregate surfacing (1" down, crusher run), mobilization, 4 EA bridge guardrail retrofit, type sc. See attached file.