Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Win These Opportunities Next
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Files
Contacts & Company Data
Premium
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
Competitor Intelligence
Premium
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe RFP - Alabama Department of Transportation Bid & RFP - Due Jun 26, 2026 | Starbridge
Work includes 11,388 LF removing guardrail, 87 LF removing raised curb channelizer, 31 EA removing guardrail end anchor (all type), 17,530 gal tack coat, 175,493 SY micro-milling existing pavement (approx 1.10" thru 2.00" thick), material remixing device, superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range e 13,381 Ton, superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range e 1,099 Ton, superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range e 1,000 Ton, 13 mile scoring bituminous pavement surface. See attached file.
Work includes 11,388 LF removing guardrail, 87 LF removing raised curb channelizer, 31 EA removing guardrail end anchor (all type), 17,530 gal tack coat, 175,493 SY micro-milling existing pavement (approx 1.10" thru 2.00" thick), material remixing device, superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range e 13,381 Ton, superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range e 1,099 Ton, superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range e 1,000 Ton, 13 mile scoring bituminous pavement surface. See attached file.
Work includes 238 LF removing guardrail, 57 ea removing guardrail end anchor (all type), 128 sta machine grading shoulders, 27,574 Gal tack coat, 275,736 SY planing existing pavement (approx 1.10" thru 2.0" thick), material remixing device, 20,123 Ton stone matrix asphalt wearing layer, 1/2" maximum aggregate size, superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range c/d 10,208 Ton, 5000 Ton superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range e. See attached file.
Work includes 238 LF removing guardrail, 57 ea removing guardrail end anchor (all type), 128 sta machine grading shoulders, 27,574 Gal tack coat, 275,736 SY planing existing pavement (approx 1.10" thru 2.0" thick), material remixing device, 20,123 Ton stone matrix asphalt wearing layer, 1/2" maximum aggregate size, superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range c/d 10,208 Ton, 5000 Ton superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range e. See attached file.