Summary
Work includes 7,703 gal tack coat, 77,021 SY micro-milling existing pavement (approx 1.10" thru 2.00" thick), material remixing device, superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range a/b 6,162 Ton, superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range c/d 193 Ton, superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range a/b 1,500 Ton, superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range a/b 500 Ton, 6 mile scoring bituminous pavement surface, 712 Ton aggregate surfacing (crushed aggregate base, type a), mobilization. See attached file.