Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 237 LF special - pipe cleanout, 27" to 48"; 33 LF special - pipe cleanout over 48"; 61 LF pipe removed, 24" and under; 80 LF pipe removed, over 24"; 27,764 CY excavation; 6,994 CY earthwork, misc spoil leveling; 7,572 CY earthwork, misc: spoil removal; 200 TN dumped rock fill, misc: type d; 60,547 SY seeding and mulching; 9,417 SY repair seeding and mulching. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of services for the MEHLOW DITCH IMPROVEMENT PROJECT.
Posted Date
Dec 30, 2025
Due Date
Jan 13, 2026
Release: Dec 30, 2025
Close: Jan 13, 2026
Procurement of services for the MEHLOW DITCH IMPROVEMENT PROJECT.
AvailableDesign/build services for trail drainage improvement project.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design/build services for trail drainage improvement project.
AvailableQualified contractors for the North Cheyenne Community Park Drainage Improvement project. The projects major work items include removal of existing pipe and manhole from the area and replacement of pipe and manhole, installation of a riprap pad, grading, and resodding of the disturbed areas to improve drainage through an area of the park that currently has standing water.
Posted Date
Dec 11, 2025
Due Date
Jan 9, 2026
Release: Dec 11, 2025
Close: Jan 9, 2026
Qualified contractors for the North Cheyenne Community Park Drainage Improvement project. The projects major work items include removal of existing pipe and manhole from the area and replacement of pipe and manhole, installation of a riprap pad, grading, and resodding of the disturbed areas to improve drainage through an area of the park that currently has standing water.
This project area is within a drainage area of approx 300 acres and the improvements will include culvert and pipe system upgrades.
Posted Date
Dec 30, 2025
Due Date
Jan 21, 2026
Release: Dec 30, 2025
Close: Jan 21, 2026
This project area is within a drainage area of approx 300 acres and the improvements will include culvert and pipe system upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.