Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project seeks to update and improve audiovisual technology in the Indian Trails Public Library District (ITPLD) public meeting rooms, and program spaces. Some areas have existing technology, and some need new technology installed. When completed, technology should be reliable, durable and flexible enough to provide visual and audio support for public programs and staff meetings including presentations, performances, films, and virtual or hybrid communication (such as a Zoom meeting or similar).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
All work associated with the Control Room Upgrades minus HVAC and Electrical work, All work associated with the Control Room Upgrades Electrical work, All work associated with the Control Room Upgrades HVAC work, Lump Sum of all work associated with the Control Room Upgrades.
Posted Date
Oct 3, 2025
Due Date
Feb 3, 2026
Release: Oct 3, 2025
Close: Feb 3, 2026
All work associated with the Control Room Upgrades minus HVAC and Electrical work, All work associated with the Control Room Upgrades Electrical work, All work associated with the Control Room Upgrades HVAC work, Lump Sum of all work associated with the Control Room Upgrades.
AvailableFurnish and supply 2 EA, JL660A HPE Aruba 6300M 24 port multirate (50 Gbs); 4 EA, JL659A HPE Aruba 6300M 48 port multirate (50 Gbs); 12 EA, JL087A Aruba X372 1050W Power Supply; 10 EA, SOV65A or comparable 50 Gbs transceivers; 1 EA, BN5K4UT#ABA, HP Z2 Tower G1i U9-285K 32GB 1TB AI Boost W11 Pro 64; 3 EA, 5PX3000RTNG2, Eaton 5PX G2 UPS, 2U, 3000 VA, 3000 W, L5-30P input, Outputs: (1) L5-30R, (6) 5-20R, 120V, Network card; 2 EA, 5PXEBM72RTG2, Eaton 5PX G2 extended battery module (EBM), 2U; 2 EA, 5PX1500RTNG2, Eaton 5PX G2 UPS, 2U, 1440 VA, 1440 W, 5-15P input, Outputs: (8) 5-15R, 120V, Network card; 2 EA, 5PX2000RTNG2, Eaton 5PX G2 UPS, 2U, 1950 VA, 1950 W, 5-20P input, Outputs: (1) L5-20R, (6) 5-20R, 120V, Network card; 2 EA, 5PX1000RTNG2, Eaton 5PX G2 UPS, 2U, 1000 VA, 1000 W, 5-15P input, Outputs: (8) 5-15R, 120V, Network card. See attached file.
Posted Date
-
Due Date
Mar 13, 2026
Provide toilet room upgrades at school - contract G - general construction work.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Release: Jan 5, 2026
Close: Jan 29, 2026
Provide toilet room upgrades at school - contract G - general construction work.
AvailableProvide Network Upgrades to including Network Switches, Network Firewall, and SmartNet on existing District hardware.
Posted Date
Jan 15, 2026
Due Date
Feb 19, 2026
Release: Jan 15, 2026
Close: Feb 19, 2026
Provide Network Upgrades to including Network Switches, Network Firewall, and SmartNet on existing District hardware.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish and supply 2 EA, JL660A HPE Aruba 6300M 24 port multirate (50 Gbs); 4 EA, JL659A HPE Aruba 6300M 48 port multirate (50 Gbs); 12 EA, JL087A Aruba X372 1050W Power Supply; 10 EA, SOV65A or comparable 50 Gbs transceivers; 1 EA, BN5K4UT#ABA, HP Z2 Tower G1i U9-285K 32GB 1TB AI Boost W11 Pro 64; 3 EA, 5PX3000RTNG2, Eaton 5PX G2 UPS, 2U, 3000 VA, 3000 W, L5-30P input, Outputs: (1) L5-30R, (6) 5-20R, 120V, Network card; 2 EA, 5PXEBM72RTG2, Eaton 5PX G2 extended battery module (EBM), 2U; 2 EA, 5PX1500RTNG2, Eaton 5PX G2 UPS, 2U, 1440 VA, 1440 W, 5-15P input, Outputs: (8) 5-15R, 120V, Network card; 2 EA, 5PX2000RTNG2, Eaton 5PX G2 UPS, 2U, 1950 VA, 1950 W, 5-20P input, Outputs: (1) L5-20R, (6) 5-20R, 120V, Network card; 2 EA, 5PX1000RTNG2, Eaton 5PX G2 UPS, 2U, 1000 VA, 1000 W, 5-15P input, Outputs: (8) 5-15R, 120V, Network card. See attached file.
Available