Work shall consist of the retrofit of an approximate 820-foot long existing paved median of varying width within Route One with work
including removal of existing pavement, construction of an internal shallow swale, two Rain Guardian turrets, one concrete forebay, FocalPoint BioFiltration System, installation of new drainage piping, placement of stone mulch, and plantings. Work associated with this Agreement shall be complete on or before June 18, 2027. Substantially complete is defined by the Town of Scarborough as having the following items completed: all drainage infrastructure, all pavement installed, all plantings installed, & all mulch installed.