Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Brookwood School District 167
Provide mechanical rooftop unit replacement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Oswegoland Park District
Rooftop unit #1 replacement.
Posted Date
Nov 20, 2025
Due Date
Dec 10, 2025
Release: Nov 20, 2025
Oswegoland Park District
Close: Dec 10, 2025
Rooftop unit #1 replacement.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Greenwood School District
Removal/installation/startup of one rooftop air handler.
Posted Date
-
Due Date
Dec 21, 2025
Greenwood School District
Close: Dec 21, 2025
Removal/installation/startup of one rooftop air handler.
AvailableEast Carolina University
Tyler rooftop unit.
Posted Date
Oct 20, 2025
Due Date
Dec 4, 2025
Release: Oct 20, 2025
East Carolina University
Close: Dec 4, 2025
Tyler rooftop unit.
Westwood Regional High School
Project generally consists of the replacement of existing unit ventilators throughout as well as the replacement of the existing pneumatic controls with new controls (trane tracer)/thermostats. Work includes, but is not limited to the following: removal and disposal of existing unit ventilators, piping, fin tube, etc. Installation of new unit ventilators, lintels, steel, etc. Modification of roof for new condensing unit(s) & exhaust fans. Replacement of shelving along the exterior walls with new. Mechanical, plumbing, electrical, fire alarm, and data modifications, relocations and installation associated with new units. Provide existing convectors with new control valves and wall mounted thermostats.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Westwood Regional High School
Close: Dec 16, 2025
Project generally consists of the replacement of existing unit ventilators throughout as well as the replacement of the existing pneumatic controls with new controls (trane tracer)/thermostats. Work includes, but is not limited to the following: removal and disposal of existing unit ventilators, piping, fin tube, etc. Installation of new unit ventilators, lintels, steel, etc. Modification of roof for new condensing unit(s) & exhaust fans. Replacement of shelving along the exterior walls with new. Mechanical, plumbing, electrical, fire alarm, and data modifications, relocations and installation associated with new units. Provide existing convectors with new control valves and wall mounted thermostats.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →