Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
AV equipment replacement at the MEB building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Renovations include updates to classrooms and study spaces, as well as modifications to the existing restrooms to comply with accessibility standards. Renovations will include selective demolition and replacement of flooring, walls, built-in lockers, paint, etc. Renovations to also include associated changes to engineering systems, electrical, mechanical, FA & FP to accommodate new areas.
Posted Date
Jan 15, 2026
Due Date
Feb 26, 2026
Release: Jan 15, 2026
Close: Feb 26, 2026
Renovations include updates to classrooms and study spaces, as well as modifications to the existing restrooms to comply with accessibility standards. Renovations will include selective demolition and replacement of flooring, walls, built-in lockers, paint, etc. Renovations to also include associated changes to engineering systems, electrical, mechanical, FA & FP to accommodate new areas.
AvailableWork includes clin 1: basement reconfiguration ( 2170 sf): partial spaces in the basement to accommodate new office and support functions for aoc and united states capitol police (uscp). Clin 2: loading dock: add a new lift at the loading dock to accommodate new office and support functions for aoc and united states capitol police (uscp). Clin 3: 5th floor build/ tenant ( 133 sf): project encompassing hazmat, selective demolition, installation of new partitions, mechanical, electrical, plumbing systems, ceiling modifications, interior finishes, life safety upgrades to accommodate new office and support functions for aoc and united states capitol police (uscp). Sprinkler Replacement: replacement of all sprinklers to accommodate new office and support functions for aoc and united states capitol police (uscp). Elevator control repair: project elevator control repair to accommodate new office and support functions for aoc and united states capitol police (uscp).
Posted Date
Jan 7, 2026
Due Date
Jan 26, 2026
Release: Jan 7, 2026
Close: Jan 26, 2026
Work includes clin 1: basement reconfiguration ( 2170 sf): partial spaces in the basement to accommodate new office and support functions for aoc and united states capitol police (uscp). Clin 2: loading dock: add a new lift at the loading dock to accommodate new office and support functions for aoc and united states capitol police (uscp). Clin 3: 5th floor build/ tenant ( 133 sf): project encompassing hazmat, selective demolition, installation of new partitions, mechanical, electrical, plumbing systems, ceiling modifications, interior finishes, life safety upgrades to accommodate new office and support functions for aoc and united states capitol police (uscp). Sprinkler Replacement: replacement of all sprinklers to accommodate new office and support functions for aoc and united states capitol police (uscp). Elevator control repair: project elevator control repair to accommodate new office and support functions for aoc and united states capitol police (uscp).
AvailableRenovation 7,125 SF on the second floor of 660 McHenry Road, Aberdeen Maryland for primary care services.
Posted Date
Jan 12, 2026
Due Date
Feb 15, 2026
Release: Jan 12, 2026
Close: Feb 15, 2026
Renovation 7,125 SF on the second floor of 660 McHenry Road, Aberdeen Maryland for primary care services.
AvailableThe Housing Authority of the City of Brownsville (HACB) issued IFB 25-004: Floor Renovation Project for Tropical Gardens Apartments (58 occupied public housing units) to provide complete, code-compliant flooring removal and installation while minimizing resident disruption. Scope includes removal and disposal of existing flooring and trim, subfloor preparation, application of underlayment and installation of Shaw resilient flooring and transition strips, and reinstallation or replacement of baseboards. Period of performance is 90 calendar days from commencement and bidders must provide a project schedule, cost breakdown, bid bond, and required certifications.
Posted Date
Jan 2, 2026
Due Date
Feb 12, 2026
Release: Jan 2, 2026
Close: Feb 12, 2026
The Housing Authority of the City of Brownsville (HACB) issued IFB 25-004: Floor Renovation Project for Tropical Gardens Apartments (58 occupied public housing units) to provide complete, code-compliant flooring removal and installation while minimizing resident disruption. Scope includes removal and disposal of existing flooring and trim, subfloor preparation, application of underlayment and installation of Shaw resilient flooring and transition strips, and reinstallation or replacement of baseboards. Period of performance is 90 calendar days from commencement and bidders must provide a project schedule, cost breakdown, bid bond, and required certifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis