Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Renovations include updates to classrooms and study spaces, as well as modifications to the existing restrooms to comply with accessibility standards. Renovations will include selective demolition and replacement of flooring, walls, built-in lockers, paint, etc. Renovations to also include associated changes to engineering systems, electrical, mechanical, FA & FP to accommodate new areas.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The University of Missouri (Planning, Design & Construction) is soliciting construction/renovation services for the Jesse Hall first floor to create multimedia exhibits, add a new information desk, and install glass doors; the project is donor-funded with an estimated base cost of $2,100,000. The solicitation is listed as active on the university procurement site with a bid open date of 2026-04-06 and a bid due date of 2026-04-21.
Posted Date
Apr 6, 2026
Due Date
Apr 21, 2026
Release: Apr 6, 2026
Close: Apr 21, 2026
The University of Missouri (Planning, Design & Construction) is soliciting construction/renovation services for the Jesse Hall first floor to create multimedia exhibits, add a new information desk, and install glass doors; the project is donor-funded with an estimated base cost of $2,100,000. The solicitation is listed as active on the university procurement site with a bid open date of 2026-04-06 and a bid due date of 2026-04-21.
AvailableAV equipment replacement at the MEB building.
Posted Date
Jan 9, 2026
Due Date
Jan 23, 2026
Release: Jan 9, 2026
Close: Jan 23, 2026
AV equipment replacement at the MEB building.
Work includes clin 1: basement reconfiguration ( 2170 sf): partial spaces in the basement to accommodate new office and support functions for aoc and united states capitol police (uscp). Clin 2: loading dock: add a new lift at the loading dock to accommodate new office and support functions for aoc and united states capitol police (uscp). Clin 3: 5th floor build/ tenant ( 133 sf): project encompassing hazmat, selective demolition, installation of new partitions, mechanical, electrical, plumbing systems, ceiling modifications, interior finishes, life safety upgrades to accommodate new office and support functions for aoc and united states capitol police (uscp). Sprinkler Replacement: replacement of all sprinklers to accommodate new office and support functions for aoc and united states capitol police (uscp). Elevator control repair: project elevator control repair to accommodate new office and support functions for aoc and united states capitol police (uscp).
Posted Date
Jan 7, 2026
Due Date
Jan 26, 2026
This RFP is for AV equipment replacement for the MEB 5th Floor at LSU Health Sciences Center in New Orleans.
Posted Date
Jan 9, 2026
Due Date
Jan 23, 2026
Release: Jan 9, 2026
Close: Jan 23, 2026
This RFP is for AV equipment replacement for the MEB 5th Floor at LSU Health Sciences Center in New Orleans.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 26, 2026
Work includes clin 1: basement reconfiguration ( 2170 sf): partial spaces in the basement to accommodate new office and support functions for aoc and united states capitol police (uscp). Clin 2: loading dock: add a new lift at the loading dock to accommodate new office and support functions for aoc and united states capitol police (uscp). Clin 3: 5th floor build/ tenant ( 133 sf): project encompassing hazmat, selective demolition, installation of new partitions, mechanical, electrical, plumbing systems, ceiling modifications, interior finishes, life safety upgrades to accommodate new office and support functions for aoc and united states capitol police (uscp). Sprinkler Replacement: replacement of all sprinklers to accommodate new office and support functions for aoc and united states capitol police (uscp). Elevator control repair: project elevator control repair to accommodate new office and support functions for aoc and united states capitol police (uscp).
Available