Closed

Measure K-14 Street Rehabilitation and Repair Project

Description: Work consists of pavement rehabilitation of approx 28 blocks, including landscaping and irrigation repair, resetting of mailboxes, resetting of sign posts, tree trimming, earthwork cutting and backfilling, removal of existing asphalt, roadway preparation, hot mix asphalt repaving street surface and conform areas, hot mix asphalt dike installation, concrete curb and gutter, concrete cross-gutter, concrete sidewalks, accessibility improvements, signage and installation of pavement striping and markings. Work also includes 3,661 SF of remove curb ramp, sidewalk and driveway; 1,119 SF of remove cross gutter and spandrel; 491 LF of remove curb and gutter; 8,126 CY of roadway excavation; 6,777 ton of hot mix asphalt (type a); 1,499 LF of place hot mix asphalt dike (city type b, 6"); 422 LF of place hot mix asphalt dike (city type b, 8"); 10 LF of short retaining wall. See attached file.

Buyer
City of Grover Beach

City · CA, US

Released
Aug 13, 2026
Closes
Sep 3, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts