Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Walker County Water And Sewerage Authority
The project consists of the following major elements: new 12" ductile iron and steel water main and booster pumping station to provide additional water to the top of lookout mountain at the resort.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Lord Fairfax Soil And Water Conservation District
Project includes phase 2 raw water line extension consists of approx 1,900 LF of 20" raw water line including a jack and bore crossing of a road and railroad with approx 137 LF of raw water line installed in steel casing. Project includes modifications to interconnections at a pump station and water treatment plant site on each end of the raw water line.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Lord Fairfax Soil And Water Conservation District
Close: Dec 18, 2025
Project includes phase 2 raw water line extension consists of approx 1,900 LF of 20" raw water line including a jack and bore crossing of a road and railroad with approx 137 LF of raw water line installed in steel casing. Project includes modifications to interconnections at a pump station and water treatment plant site on each end of the raw water line.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Borough of Chambersburg
Project consists of water main extension project. See attached file.
Posted Date
Sep 12, 2025
Due Date
Dec 9, 2025
Release: Sep 12, 2025
Borough of Chambersburg
Close: Dec 9, 2025
Project consists of water main extension project. See attached file.
AvailableBarrow County
Work includes covered bridge road water main extension project.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Barrow County
Close: Dec 18, 2025
Work includes covered bridge road water main extension project.
AvailableLewis County
The Lewis County Economic Development Authority requests sealed bids for Contract #1 – Corridor H Water Line Extension, including approximately 26,000 linear feet of water distribution main, one booster pump station, hydrants, valves, customer connections, and associated surface repairs. Bids are due at the Lewis County EDA by 3:00 PM on Wednesday, December 17, 2025, with a mandatory pre‑bid on December 3, 2025.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Lewis County
Close: Dec 17, 2025
The Lewis County Economic Development Authority requests sealed bids for Contract #1 – Corridor H Water Line Extension, including approximately 26,000 linear feet of water distribution main, one booster pump station, hydrants, valves, customer connections, and associated surface repairs. Bids are due at the Lewis County EDA by 3:00 PM on Wednesday, December 17, 2025, with a mandatory pre‑bid on December 3, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →