Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the following major elements: new 12" ductile iron and steel water main and booster pumping station to provide additional water to the top of lookout mountain at the resort.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Town of Pineville, West Virginia is soliciting bids for the Brenton/Baileysville/Doublecamp Branch Road Water Line Extension. The project includes approximately 39,000 LF of 8-inch water line, a 172,000-gallon water storage tank, and related appurtenances with a mandatory pre-bid on January 29, 2026 at 11:00 AM. Bids are due February 26, 2026 at 2:00 PM local time at 75 Main Avenue, Pineville, WV 24874.
Posted Date
Jan 7, 2026
Due Date
Feb 26, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Pineville, West Virginia is soliciting bids for the Brenton/Baileysville/Doublecamp Branch Road Water Line Extension. The project includes approximately 39,000 LF of 8-inch water line, a 172,000-gallon water storage tank, and related appurtenances with a mandatory pre-bid on January 29, 2026 at 11:00 AM. Bids are due February 26, 2026 at 2:00 PM local time at 75 Main Avenue, Pineville, WV 24874.
AvailableThis RFP is for the installation of approximately 4,100 linear feet of 12" water line by open-cut methods along Ransdell Road and Donny Brook Road to Lake Wheeler Road. The project involves connecting to existing waterlines and includes a trenchless installation across Ransdell Road and an air release manhole.
Posted Date
Jan 8, 2026
Due Date
Feb 3, 2026
Release: Jan 8, 2026
Close: Feb 3, 2026
This RFP is for the installation of approximately 4,100 linear feet of 12" water line by open-cut methods along Ransdell Road and Donny Brook Road to Lake Wheeler Road. The project involves connecting to existing waterlines and includes a trenchless installation across Ransdell Road and an air release manhole.
AvailableWork includes approx 10,231 LF of 8" PVC C900 DR18 water line pipe; 126 LF of 12" waterline bore without casing; 20 EA 12" gate valve awwa 509; 681 SY driveway repair (concrete). See outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 27, 2026
Release: Dec 3, 2025
Close: Jan 27, 2026
Work includes approx 10,231 LF of 8" PVC C900 DR18 water line pipe; 126 LF of 12" waterline bore without casing; 20 EA 12" gate valve awwa 509; 681 SY driveway repair (concrete). See outside link.
AvailableRFP for a water main extension project.
Posted Date
Dec 15, 2025
Due Date
Feb 3, 2026
Release: Dec 15, 2025
Close: Feb 3, 2026
RFP for a water main extension project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →