Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Mc Leansboro
Work includes fire station new addition
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Cynthiana
Fire station #1 addition.
Posted Date
-
Due Date
Dec 2, 2025
Release: -
City of Cynthiana
Close: Dec 2, 2025
Fire station #1 addition.
AvailableTown of Boscawen
Construct two 22βx58β additions to the existing fire station. Foundation: 4β frost walls with 8β concrete slab. The additions will have 2βx6β wood frame walls with 10β8β ceiling height. New bearing walls (posts and beams) will be attached to the existing building (north and south walls) to support new roof trusses. The additions will have 22β span mono pitch trusses, 3/12 pitch, framed to connect to the existing roof pitch. Interior will be finished with 5/8β sheetrock. Exterior siding and trim to match existing addition. Roofing: Metal or PVC. Roofing should include the entire main roof. Sprinkler system per NFPA Requirements.
Posted Date
Oct 21, 2025
Due Date
Dec 10, 2025
Release: Oct 21, 2025
Town of Boscawen
Close: Dec 10, 2025
Construct two 22βx58β additions to the existing fire station. Foundation: 4β frost walls with 8β concrete slab. The additions will have 2βx6β wood frame walls with 10β8β ceiling height. New bearing walls (posts and beams) will be attached to the existing building (north and south walls) to support new roof trusses. The additions will have 22β span mono pitch trusses, 3/12 pitch, framed to connect to the existing roof pitch. Interior will be finished with 5/8β sheetrock. Exterior siding and trim to match existing addition. Roofing: Metal or PVC. Roofing should include the entire main roof. Sprinkler system per NFPA Requirements.
AvailableTown of Irasburg
The Town of Irasburg seeks construction bids for remodeling and adding to the Town Garage and Fire Station, including new siding, insulation, a 10'x34' addition, a 16'x64' re-frame, and mechanical, electrical, and plumbing upgrades.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Town of Irasburg
Close: Dec 10, 2025
The Town of Irasburg seeks construction bids for remodeling and adding to the Town Garage and Fire Station, including new siding, insulation, a 10'x34' addition, a 16'x64' re-frame, and mechanical, electrical, and plumbing upgrades.
AvailableTown of Irasburg
The Town of Irasburg seeks construction bids for remodeling and adding to the Town Garage and Fire Station, including new siding, insulation, a 10'x34' addition, a 16'x64' re-frame, and mechanical, electrical, and plumbing upgrades.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Town of Irasburg
Close: Dec 10, 2025
The Town of Irasburg seeks construction bids for remodeling and adding to the Town Garage and Fire Station, including new siding, insulation, a 10'x34' addition, a 16'x64' re-frame, and mechanical, electrical, and plumbing upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis