Summary
Curtainwall Second, third, fourth, and fifth joint sealant replacement. Approximate surface square footage: 15,000 (Partial North and West elevations). Repair includes the removal of existing sealants. Installation of wet glazing sealant in accordance with the installation guidelines outlined in the Project Specifications. Work includes installation of Bond Breaker Tape, Backer Rod, Glazing Tape, Silicon Tape, Sealant Joints, and gaskets. Removal and replacement of coping sealant at existing locations. Removal of existing weep tubes and replacement with reticulated foam baffles. IGU Replacement Replace five fogged IGU lites and replace one large window opening on the 5th-floor North Hallway.