City of Athens
Work includes 25 EA clearing and mulching/removing trees (>6" dbh); 636 LF 18" astm f679 (ps 115) PVC gravity sewer pipe, by open cut; 62 LF anchored cover over proposed pipe, and related riprap lining; 33 LF 14" steel casing pipe, botoc; 5 EA 5' dia. Internal drop concrete manhole (up to 6' depth); 91 VF 100-mil epoxy coating of new 5' dia manholes (including benches, floors, and cones); 3 EA replace ring & cover assembly and raise cover to 6" above existing grade; 10 EA service lateral re-connections (all sizes and lengths; includes cleanout assembly); 8 EA temporary sanitary sewer facilities to affected property owners. See attached files.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
South Tahoe Public Utilities District
Work include sewer line spot repair & lateral abandonment services.
Posted Date
Oct 31, 2025
Due Date
Nov 24, 2025
Release: Oct 31, 2025
South Tahoe Public Utilities District
Close: Nov 24, 2025
Work include sewer line spot repair & lateral abandonment services.
AvailableCity of Seattle
Project consists of remove above-grade structures, cabinets, hatches, concrete pads, piping, electrical service, water service and other items and appurtenances, remove pump station below grade mechanical and electrical items including all plumbing, piping, valves, fittings, instrumentation equipment, conduit, wiring, devises, supports, and appurtenances. Installation of cipp liner for existing 15" sewer pipe. Furnish and install 8" no-dig ductile iron pipe pss sewer main to line and grade by trenchless guided boring method. See outside link.
Posted Date
Nov 10, 2025
Due Date
Dec 10, 2025
Release: Nov 10, 2025
City of Seattle
Close: Dec 10, 2025
Project consists of remove above-grade structures, cabinets, hatches, concrete pads, piping, electrical service, water service and other items and appurtenances, remove pump station below grade mechanical and electrical items including all plumbing, piping, valves, fittings, instrumentation equipment, conduit, wiring, devises, supports, and appurtenances. Installation of cipp liner for existing 15" sewer pipe. Furnish and install 8" no-dig ductile iron pipe pss sewer main to line and grade by trenchless guided boring method. See outside link.
AvailableCity of Seattle
Project consists of remove above-grade structures, cabinets, hatches, concrete pads, piping, electrical service, water service and other items and appurtenances, remove pump station below grade mechanical and electrical items including all plumbing, piping, valves, fittings, instrumentation equipment, conduit, wiring, devises, supports, and appurtenances. Installation of cipp liner for existing 15" sewer pipe. Furnish and install 8" no-dig ductile iron pipe pss sewer main to line and grade by trenchless guided boring method. See outside link.
Posted Date
Nov 10, 2025
Due Date
Dec 10, 2025
Release: Nov 10, 2025
City of Seattle
Close: Dec 10, 2025
Project consists of remove above-grade structures, cabinets, hatches, concrete pads, piping, electrical service, water service and other items and appurtenances, remove pump station below grade mechanical and electrical items including all plumbing, piping, valves, fittings, instrumentation equipment, conduit, wiring, devises, supports, and appurtenances. Installation of cipp liner for existing 15" sewer pipe. Furnish and install 8" no-dig ductile iron pipe pss sewer main to line and grade by trenchless guided boring method. See outside link.
City of Winchester
Work will include: installation of approximately 177 LF Of storm sewer pipe, 5 storm structures, demolition of concrete and asphalt, new asphalt and concrete pavement, grading, erosion control, abandonment in place of the existing storm sewer with flowable fill, and all other appurtenances.
Posted Date
-
Due Date
Dec 4, 2025
City of Winchester
Close: Dec 4, 2025
Work will include: installation of approximately 177 LF Of storm sewer pipe, 5 storm structures, demolition of concrete and asphalt, new asphalt and concrete pavement, grading, erosion control, abandonment in place of the existing storm sewer with flowable fill, and all other appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis