Summary
The contractor shall provide all labor, materials, equipment, and supervision necessary to perform the following: Site preparation: Verify all dimensions and existing site conditions prior to commencement of work; Protect adjacent finishes, walls, doors, historic features, furnishings, and building systems from damage during removal and installation; Remove and reinstall moveable furniture as necessary for carpet tile removal and installation; Remove and reinstall vinyl base where existing in limited areas; Coordinate work to minimize disruption to building occupants and visitor operations. Work may require phased installation, after-hours access, or weekend work depending on operational requirements. See attached file.