Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes the following high school: provide glycol concentrate to existing geothermal heat pump piping system to raise system concentration. Elementary school: drain, flush, and fill entire heating system with new propylene glycol.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of replacement glycol chiller for existing wine tank cooling system in the college cellars production winery. Existing glycol distribution piping and tank controls remain in place.
Posted Date
Dec 15, 2025
Due Date
Jan 13, 2026
Release: Dec 15, 2025
Close: Jan 13, 2026
Work consists of replacement glycol chiller for existing wine tank cooling system in the college cellars production winery. Existing glycol distribution piping and tank controls remain in place.
AvailableBoiler replacement at elementary school.
Posted Date
Dec 21, 2025
Due Date
Jan 16, 2026
Release: Dec 21, 2025
Close: Jan 16, 2026
Boiler replacement at elementary school.
AvailableProject consists of HVAC replacement.
Posted Date
-
Due Date
Jan 7, 2026
Release: -
Close: Jan 7, 2026
Project consists of HVAC replacement.
AvailableDemolition and replacement of the existing kitchen walk-in cooler and freezer at the specified project sites. Work includes expansion of the freezer into the existing dry storage room and expansion of the existing cooler and freezer into the kitchen. The project includes replacement of refrigeration equipment and all related utility work required for a fully functional system.
Posted Date
Nov 19, 2025
Due Date
Jan 13, 2026
Release: Nov 19, 2025
Close: Jan 13, 2026
Demolition and replacement of the existing kitchen walk-in cooler and freezer at the specified project sites. Work includes expansion of the freezer into the existing dry storage room and expansion of the existing cooler and freezer into the kitchen. The project includes replacement of refrigeration equipment and all related utility work required for a fully functional system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis