CityCT
Posted
Oct 8, 2026
Oct 23, 2026
336 Franklin Street Rehabilitation RFP
Work inlcudes street rehabilitation.
Description: Work includes to rehabilitate twelve (12) existing sand filters, associated equipment, remove and replace seven (7) kinetrol pneumatic actuator yokes on 20-inch butterfly valves (filter cells 1, 2, 7, 8, 11, and 12), flange bolts on 20-inch backwash inlet butterfly valve (filter cell 7, will only be necessary if contractor confirms the valve is not functioning), two (2) 18-inch backwash pump discharge check valves (will only be necessary if contractor tests and confirms the backwash flow rate is compromised), sodium hypochlorite pumps and associated piping.
City · FL, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityCT
Posted
Oct 8, 2026
Oct 23, 2026
Work inlcudes street rehabilitation.
CityOK
Posted
Oct 13, 2026
Nov 19, 2026
The project is generally the rebuild and rehabilitation of various streets.
CityMO
Posted
Sep 10, 2026
Nov 4, 2026
Work consists of grading, paving, and drainage to provide ADA compliant sidewalk.
CityMO
Posted
Sep 10, 2026
Nov 4, 2026
Work consists of grading, paving, and drainage to provide ADA compliant sidewalk.
Decision makers connected to this RFP from City of Clearwater.