Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of advanced traffic management system (atms) to install fiber optic cable and additional intelligent transportation system devices.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes but is not limited to water main installation within County. The work includes approx. 11,300 LF of new 8" and 12" water main, together with all associated valves, hydrants, and connections to existing mains. The project also includes water services along each of these locations, including full length services from the public water main to within 5-FT of existing homes being serviced.
Posted Date
Nov 11, 2025
Due Date
Dec 15, 2025
Release: Nov 11, 2025
Close: Dec 15, 2025
The project includes but is not limited to water main installation within County. The work includes approx. 11,300 LF of new 8" and 12" water main, together with all associated valves, hydrants, and connections to existing mains. The project also includes water services along each of these locations, including full length services from the public water main to within 5-FT of existing homes being serviced.
Premium
Access the largest public sector contact database
Work consist of install approximately 11,000 LF of 16" c909 PVC waterline within the rightof-way, install approx. 22,000 LF of two 3" schedule 90 PVC conduits in a shared trench with the waterline, perform open-cut and trenchless (bore) installation methods, including all necessary fittings, connections, and restoration, maintain continuous water service during construction.
Posted Date
Nov 27, 2025
Due Date
Jan 8, 2026
Release: Nov 27, 2025
Close: Jan 8, 2026
Work consist of install approximately 11,000 LF of 16" c909 PVC waterline within the rightof-way, install approx. 22,000 LF of two 3" schedule 90 PVC conduits in a shared trench with the waterline, perform open-cut and trenchless (bore) installation methods, including all necessary fittings, connections, and restoration, maintain continuous water service during construction.
AvailableIDOT is letting a project to resurface and widen W. Pleasant Hill Road between Union Hill Road and McLafferty Road in Carbondale, Jackson County, Illinois. The work includes HMA shoulders, PCC driveways, and culvert work. This is a single-project construction solicitation managed via IDOT’s Web Contract Bulletin for the January 16, 2026 letting.
Posted Date
Nov 25, 2025
Due Date
Jan 16, 2026
Release: Nov 25, 2025
Close: Jan 16, 2026
IDOT is letting a project to resurface and widen W. Pleasant Hill Road between Union Hill Road and McLafferty Road in Carbondale, Jackson County, Illinois. The work includes HMA shoulders, PCC driveways, and culvert work. This is a single-project construction solicitation managed via IDOT’s Web Contract Bulletin for the January 16, 2026 letting.
AvailableWork includes to install approx 4.1 miles of 48 count single-mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit, and aerial attachments to poles, entrances and interconnect equipment for four existing traffic control cabinets and the installation of four traffic management cameras.
Posted Date
Nov 26, 2025
Due Date
Dec 16, 2025
Release: Nov 26, 2025
Close: Dec 16, 2025
Work includes to install approx 4.1 miles of 48 count single-mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit, and aerial attachments to poles, entrances and interconnect equipment for four existing traffic control cabinets and the installation of four traffic management cameras.